Boltcracker Ltd
Boltcracker’ was developed in 2011 by Colin O’Gara. Colin had experienced problems when constructing steel framed buildings, when at bolt installation stage. Prior to ‘Boltcracker’ it was common practice to apply an oil based tape around the base of the bolt which would hopefully give some movement within the cone, when the top of the bolt was struck with a hammer; when the surrounding concrete had set. Colin found this practice to be both unreliable, time consuming and problematic in many ways. The use of an oil based tape and sledge hammers posed health and safety risks as they involve the use of chemicals and noise/vibration risks to operatives. The failure of these measures to create movement around the bolt impacted on overall project schedules and costs due to extra time being spent bringing in additional trades to remedy the problem. ‘Boltcracker’ eliminates all the risks previously encountered when installing bolts.
7-day free trial · no credit card
Verified contacts
1
available on Kipplo
LinkedIn employees
3
1 to 10 range
Open roles
—
no listings
Distinct roles
1
indexed titles
Tech stack
0
tools in use
Monthly traffic
—
organic / mo
Sign up free to see all 1 verified contacts at Boltcracker Ltd
Free for 7 days · 50 credits · no card · only pay for verified records.
Decision-makers and verified team members
1 contacts with verified email or phone · masked until revealed.
No verified contacts on record for this company yet.
Top roles at Boltcracker Ltd
1 distinct titles indexed · top 1 shown.
- 1marketing manager
Sign up to unlock all 1 contacts at Boltcracker Ltd
Free for 7 days · 50 credits · no card · only pay for verified records.
Sign up to reveal 1 verified contacts at Boltcracker Ltd
7-day trial · no credit card · cancel anytime · only pay for verified records.
Trusted by sales, marketing, and GTM engineering teams.