Downeast Lng
Downeast LNG was originally proposed in 2004 as a LNG import facility serving the New England and Boston market. The project completed FERC permitting under with the successful issuance of a Final EIS. The project generated considerable political support at the local, state and federal levels. Due to changing market conditions the project was redesigned to include LNG liquefaction capacity with a proposed 4 million ton export capacity. The project used Marcellus shale gas to develop a mid-scale LNG solution for surplus northeast gas. It utilized Air Products CSMR technology and full containment storage tanks. CH-IV was the owner's engineer and Chicago Bridge & Iron was the EPC. The project was mothballed due to market conditions.
7-day free trial · no credit card
Verified contacts
2
available on Kipplo
LinkedIn employees
2
1 to 10 range
Open roles
—
no listings
Distinct roles
2
indexed titles
Tech stack
1
tools in use
Monthly traffic
—
organic / mo
Sign up free to see all 2 verified contacts at Downeast Lng
Free for 7 days · 50 credits · no card · only pay for verified records.
Decision-makers and verified team members
2 contacts with verified email or phone · masked until revealed.
Showing 1 of 2 verified contacts
Top roles at Downeast Lng
2 distinct titles indexed · top 2 shown.
- 1sales manager
- 1senior programs manager
Sign up to unlock all 2 contacts at Downeast Lng
Free for 7 days · 50 credits · no card · only pay for verified records.
Sign up to reveal 2 verified contacts at Downeast Lng
7-day trial · no credit card · cancel anytime · only pay for verified records.
Trusted by sales, marketing, and GTM engineering teams.