Fds Farsund Drilling Solution As
Drillstring repair and replacement is a major cost on drilling rigs today. Box threads should get a uniform layer of pipe dope before racking. Pitting and galling on threads and shoulder are mostly related to insufficient coverage of dope. The Dope Application Machine (DAM) patent is a rotating brush that fits the box threads. Dope is applied through independent channels inside the brush. The doping sequence takes typically 10-15 sec, is done when POOH after the IR has unscrewed the stand and before ready to start pulling the next. The DAM will save rig time and reduces drillstring maintenance cost. Safety will improve as there will be no need for crews to enter the red zone to dope the saver sub on drilling connections. The machine has proven to be very reliable, requires very little maintenance and can be integrated with the rig anti-collision systems and other control systems.
7-day free trial · no credit card
Verified contacts
1
available on Kipplo
LinkedIn employees
3
11 to 50 range
Open roles
—
no listings
Distinct roles
1
indexed titles
Tech stack
0
tools in use
Monthly traffic
—
organic / mo
Sign up free to see all 1 verified contacts at Fds Farsund Drilling Solution As
Free for 7 days · 50 credits · no card · only pay for verified records.
Decision-makers and verified team members
1 contacts with verified email or phone · masked until revealed.
Showing 1 of 1 verified contacts
Top roles at Fds Farsund Drilling Solution As
1 distinct titles indexed · top 1 shown.
- 1managing director
Sign up to unlock all 1 contacts at Fds Farsund Drilling Solution As
Free for 7 days · 50 credits · no card · only pay for verified records.
Sign up to reveal 1 verified contacts at Fds Farsund Drilling Solution As
7-day trial · no credit card · cancel anytime · only pay for verified records.
Trusted by sales, marketing, and GTM engineering teams.