Merced Irrigation District
Merced Irrigation District owns, operates and maintains the New Exchequer and McSwain dams, reservoirs, and hydroelectric facilities. The District's Water System diverts water from the Merced River at two locations. The Northside Canal diversion serves about acres of farm ground north of the Merced River. The Main Canal diversion has a capacity of cfs, and is located 3 miles downstream of the McSwain Dam. The diversion is from a small reservoir created by the Crocker Huffman Diversion Dam, owned and operated by the District. The Diversion Dam also provides water to salmon and trout hatcheries and rearing facilities. Irrigation water for agricultural purposes has historically flowed from these two diversion points to some acres of land irrigated in 2007 within Merced Irrigation District boundaries, encompassing gross acres. In addition to surface water from the Merced River, the Merced Irrigation District owns, operates and maintains 239 deep irrigation wells of which 170 are currently active. These deep irrigation wells have historically developed a maximum of 182,900 acre feet at 100% pumping capacity (1976). The wells have been used by the District conjunctively with surface water since the wells were installed. Merced Irrigation District owns, operates and maintains five recreation areas adjacent to the lakes behind New Exchequer and McSwain Dams. Merced Irrigation District is authorized to act as an electric utility under the California Water Code. Merced Irrigation District has owned and operated hydroelectric generating facilities on the Merced River since 1927. In 1995, Merced Irrigation District exercised its authority to sell power to retail electric customers. Merced Irrigation District offers its customers full requirements electric service including power supply and delivery to the customer.
7-day free trial · no credit card
Verified contacts
104
available on Kipplo
LinkedIn employees
112
51 to 200 range
Open roles
—
no listings
Distinct roles
70
indexed titles
Tech stack
1
tools in use
Monthly traffic
2.2K
organic / mo
Sign up free to see all 104 verified contacts at Merced Irrigation District
Free for 7 days · 50 credits · no card · only pay for verified records.
Decision-makers and verified team members
104 contacts with verified email or phone · masked until revealed.
- BG
Brooke Gutierrez
Director of Parks · Public Administration & Safety
EmailPhone - MH
Mike Howells
IT Manager · Information Technology
EmailPhone - MJ
Mike Jensen
Public and Government Relations Manager · Public Administration & Safety
EmailPhone - TD
Tom Duffy
Hydroelectric Department Manager · Operations
EmailPhone - AS
Andrew Suffecool
Scada Technician · Operations
EmailPhone - AT
Andrew Trimble
Substation Tech · Operations
EmailPhone - CC
Chris Curtis
Geographic Information System Specialist · Information Technology
EmailPhone - CS
Cinthia Sanderson
HR Assistant · Human Resources
EmailPhone - DK
Damanpreet Kaur
Accountant · Finance & Accounting
EmailPhone
Showing 9 of 104 verified contacts
Top roles at Merced Irrigation District
70 distinct titles indexed · top 10 shown.
- 7customer service representative
- 4accountant
- 4park ranger
- 3associate engineer
- 3park aide
- 3water resources engineer
- 2accounts payable technician
- 2administrative assistant
- 2distribution system operator
- 2dso
- +60more titles
Sign up to unlock all 104 contacts at Merced Irrigation District
Free for 7 days · 50 credits · no card · only pay for verified records.
Sign up to reveal 104 verified contacts at Merced Irrigation District
7-day trial · no credit card · cancel anytime · only pay for verified records.
Trusted by sales, marketing, and GTM engineering teams.