VerifiedTelecommunications· Founded 2007

Tonaquint Data Centers

Tonaquint, established 2008 in St. George, UT. TDC offers over sq. ft. of data center space in our current facility located in the Tonaquint Business Park. Facility Size: Approximately square feet Completed: 3rd Quarter, 2008. Raised floor area is 17,200 usable square feet. Floor Load: Typical structural capacity of 1250 pounds per square foot. Building Access: 24x7x365, Building Security: Video surveillance at all building entrances Shipping and receiving dock with remote monitored gate and secured storage Private parking area for all emploees and customers Monitored visitor parking Telecommunications: Zayo UTOPIA Tonaquint Century Link TDS Telecom South Central Level(3) Communicatoins Electric Lightwave Telecom Commercial Power: Utility Power 25MW primary substation 15MW secondary substation Total power plant 4MW Fuel Tank: Fuel storage for minimum 48-hr run time. Currently, gallons on site. Generators: Three (3) 2MW Caterpillar generators and eight (8) 750KVA Liebert UPS units. Entire generator plant designed at N+1 redundancy. Fire Supression: FM200 VESDA (Very Early Smoke Detection Alarm) above and below floor. Double interlock pre-action throughout. HVAC: DX30 ton computer room air conditioner units. N+1 redundancy on all systems. Ceiling Heights: Typically finished 10 feet from raised floor.

7-day free trial · no credit card

HeadquartersSt George, United StatesEmployees38(11 to 50)Founded year2007Websitetonaquint.comLinkedIn profileLinkedIn

Verified contacts

2

available on Kipplo

LinkedIn employees

38

11 to 50 range

Open roles

no listings

Distinct roles

2

indexed titles

Tech stack

2

tools in use

Monthly traffic

95

organic / mo

Sign up free to see all 2 verified contacts at Tonaquint Data Centers

Free for 7 days · 50 credits · no card · only pay for verified records.

Sign up free

Decision-makers and verified team members

2 contacts with verified email or phone · masked until revealed.

Sign up free →

Showing 1 of 2 verified contacts

Top roles at Tonaquint Data Centers

2 distinct titles indexed · top 2 shown.

  • 1controller
  • 1networks operations center operator

Sign up to unlock all 2 contacts at Tonaquint Data Centers

Free for 7 days · 50 credits · no card · only pay for verified records.

Sign up free

Sign up to reveal 2 verified contacts at Tonaquint Data Centers

7-day trial · no credit card · cancel anytime · only pay for verified records.

Trusted by sales, marketing, and GTM engineering teams.

Tonaquint Data Centers | Kipplo Discover