Vertech Engineering Ltd
Employed as Project Manager for fabrication and fit-out of 2X (9) Nine Modules for the Control and Power gathering and distribution of an Offshore Wind Turbine Development. Sub-Contract from for Siemens of Manchester. Value £2, The whole project could see up to 341 turbines being constructed in an area of up to around 245 square kilometres on and between the two sandbanks, Long Sand and Kentish Knock. On construction of phase one of the wind turbine project- Generation is expected to start before the end of 2011 and phase one completed in 2012. – These Offshore substations will step up the voltage to reduce losses, before feeding the power to an onshore Sub-Station tied into the National Grid.
7-day free trial · no credit card
Verified contacts
2
available on Kipplo
LinkedIn employees
51 to 200
headcount range
Open roles
—
no listings
Distinct roles
2
indexed titles
Tech stack
0
tools in use
Monthly traffic
—
organic / mo
Sign up free to see all 2 verified contacts at Vertech Engineering Ltd
Free for 7 days · 50 credits · no card · only pay for verified records.
Decision-makers and verified team members
2 contacts with verified email or phone · masked until revealed.
No verified contacts on record for this company yet.
Top roles at Vertech Engineering Ltd
2 distinct titles indexed · top 2 shown.
- 1architectural designer
- 1welding
Sign up to unlock all 2 contacts at Vertech Engineering Ltd
Free for 7 days · 50 credits · no card · only pay for verified records.
Sign up to reveal 2 verified contacts at Vertech Engineering Ltd
7-day trial · no credit card · cancel anytime · only pay for verified records.
Trusted by sales, marketing, and GTM engineering teams.