Virtual Construction Advisors
Why are construction projects plagued with change orders and delays? The answer is, most construction documents are not "fabrication-ready", and aren't even intended to be. They are what is termed "Level of Development 300" which is that only the general shapes and sizes of the building elements are resolved. The intent of designers and engineers is that the General Contractor will complete the documents by the use of shop drawings, layout drawings, and will do the clash detection and coordination to make all the parts and pieces of the building fit together. This is termed "Level of Development 400" and is ready for a tradesperson to begin fabricating the building This is where we come in. We occupy that space between design and construction using our extensive background as Architects, construction experts and BIM modelers to create a complete, accurate and constructible model of the building, where all the clashes and errors are resolved, ready to build. Our goal is, quite immodestly, to eradicate change orders and delays
7-day free trial · no credit card
Verified contacts
1
available on Kipplo
LinkedIn employees
6
1 to 10 range
Open roles
—
no listings
Distinct roles
1
indexed titles
Tech stack
0
tools in use
Monthly traffic
—
organic / mo
Sign up free to see all 1 verified contacts at Virtual Construction Advisors
Free for 7 days · 50 credits · no card · only pay for verified records.
Decision-makers and verified team members
1 contacts with verified email or phone · masked until revealed.
No verified contacts on record for this company yet.
Top roles at Virtual Construction Advisors
1 distinct titles indexed · top 1 shown.
- 1founder
Sign up to unlock all 1 contacts at Virtual Construction Advisors
Free for 7 days · 50 credits · no card · only pay for verified records.
Sign up to reveal 1 verified contacts at Virtual Construction Advisors
7-day trial · no credit card · cancel anytime · only pay for verified records.
Trusted by sales, marketing, and GTM engineering teams.