Andre Piewe
Senior Workover & Well Intervention Supervisor at Perenco
Based in Dubai, United Arab Emirates
7-day free trial · no credit card
Seniority
Manager
Department
Other
Location
Dubai
Industry
Oil and Gas
Company size
7K
Contact information
Reveal Andre's email and phone
Direct contact data is gated. Sign up and reveal. You only pay for verified records.
a•••••••@perenco.com
Phone
5 credits+971 ••• •••• ••••
You only pay for valid records. Bounced emails and disconnected numbers cost nothing.
Background
About Andre Piewe
I've spent the last 12 years on rigs, offshore and onshore, supervising workover, well intervention and completion operations across Africa. Today I lead 350Klbs HWU campaigns for Perenco in the DRC, and I'm preparing my next move: a senior supervisor role in the UAE or GCC.What I love about this job is how unforgiving it is. A workover is rarely about doing one thing perfectly; it's about anticipating the next ten problems before they happen. That's where I've learned to add the most value.Over the years, my crews have cut NPT by 50 to 60% on our campaigns, not through faster execution, but through patient program reviews and honest conversations with service companies before the rig even moves.Some numbers I'm proud of: Across the wells I've supervised (70 to 85 producing wells, depending on the field), we deliver 8 to 12 major workovers a year with an 85% success rate. The average operation runs 34 days and a USD 1.5–2M budget.The largest job I've handled — a Parker fishing followed by a gravel pack completion, came in on plan. The most technical, a dual completion, came in with zero HSE incident. I work with multicultural crews of 30 to 35 people (Cameroonian, Nigerian, French, Ivorian, Turkish) and 4 to 5 service companies on the same campaign. Getting that many moving parts to pull in the same direction is, honestly, the part I enjoy most. Clear PTW discipline and one shared HSE language go a long way.On the technical side, I'm hands-on with HWU 240Klbs and 350Klbs, fishing and milling (Parker), gravel pack above and below packer, ESP POOH/RIH, perforation (TCP and E-line), packer setting (SC1, QHS), bridge plug, scraping, dual completion, and the usual completion accessories (SPM, downhole gauge, TRSV, SSD, chemical injection line, nipples).I'm IWCF Surface BOP Level 4 and IWCF Well Intervention Level 4 certified, with BOSIET, Offshore Survival, PTW and First AidContact : andrepiewe@yahoo.fr; Whatsapp: 00(237) 698474885 / 676 655 791
Decision-makers
Other people at Perenco
Build a list of verified contacts at Perenco
Free for 7 days · 50 credits · no card · only pay for verified records.
Reach more buyers like Andre
250M+ professionals with verified email and phone. You only pay for records that actually verify.
7-day trial · no credit card · cancel anytime