Andrii Tymchenko
Site Manager at Tekeria
Based in Les Ulis, France
7-day free trial · no credit card
Seniority
Manager
Department
Construction
Location
Les Ulis
Industry
Services for Renewable Energy
Company size
23
Contact information
Reveal Andrii's email and phone
Direct contact data is gated. Sign up and reveal. You only pay for verified records.
a•••••••@tekeria.com
Phone
5 credits+33 ••• •••• ••••
You only pay for valid records. Bounced emails and disconnected numbers cost nothing.
Background
About Andrii Tymchenko
Participation in projects Since may 2022 I have being working for the Tekeria in behalf of Nordex like site manager. My last projects: NFR-PLOU, 5 WTGs N117/3,4 MW TS106-1 01/2024 - 06/2024 NBE-SPY, 1 WTG N117/3,0 MW TS91, 1 WTG N131/3,0 mW TS84 12/2024 - 04/2025 NFR-LORV, 5 WTGs N133/4,8 MW TS110 04/2025 - current time Between these project I was honored to work in behalf of Nordex as Site Manager for another project in the different stages of construction. My general responsibility is organisation of site activity, interaction of teams. Name of project: 750 kV Zaporizka NPP – SS 750 kV overhead transmission line with construction of the 750kV Kahovska substation and diversion of the 330kV overhead transmission lines from SS 330 kV Khersonska and SS 330 kV Kahovska. Lot 2. Construction of the SS 750kV Kahovska. Duration: 2014 - 2016 Client: NPC “Ukrenergo” Main Project Features: Construction of the 750 kV Kahovska substation. Position held: Chief of SS 750 kV Activities performed: Supervision for civil and installation works. Name of project: 750 kV Zaporizka NPP – SS 750 kV overhead transmission line with. Lot 3. Reconstruction of the SS 330 kV Kahovska Duration: 2011 - 2013 Client: NPC “Ukrenergo” Main Project Features: Replacement of equipment 6-330 kV including switchgear bus gentries and conducts. Position held: Chief engineer Kherson electrical network Activities performed: Supervision of implementation of project Name of project: 330kV Kahovska – Djankoi overhead transmission line. Reconstruction OHL 330 kV with replacement the towers, conducts and insulation strings. Duration: 2013 Client: NPC “Ukrenergo” Main Project Features: Replacement the OHL towers with conduct and insulation strings Position held: Chief engineer Kherson electrical network Activities performed: Supervision of implementation of project. Liaising with local authorities and farmers. Activity for environmental protection Name of project: Emergency control system of South of Ukraine Duration: 2009 - 2011 Client: NPC “Ukrenergo” Main Project Features: Arrangement network of carrier current protection channels between South, Dnieper and Crimean power systems. Makeup and set high-frequency transceivers on the SS 330 kV. Position held: Deputy of Chief engineer, Kherson electrical network Activities performed: Installation switchgear equipment, cables facilities
Decision-makers
Other people at Tekeria
Build a list of verified contacts at Tekeria
Free for 7 days · 50 credits · no card · only pay for verified records.
Reach more buyers like Andrii
250M+ professionals with verified email and phone. You only pay for records that actually verify.
7-day trial · no credit card · cancel anytime