Angel Chavez

Plant Operations Manager at Pkc Group

Based in Del Rio, United States

View on LinkedIn

7-day free trial · no credit card

Seniority

Manager

Department

Manufacturing & Production

Location

Del Rio

Industry

Motor Vehicle Manufacturing

Company size

3.3K

Contact information

Reveal Angel's email and phone

Direct contact data is gated. Sign up and reveal. You only pay for verified records.

Email

1 credit

a•••••••@pkcgroup.com

Phone

5 credits

+1 ••• •••• ••••

You only pay for valid records. Bounced emails and disconnected numbers cost nothing.

Background

About Angel Chavez

SELECTED ACCOMPLISHMENTS 1) Developed and integrated an e-Kanban database for wire processing based on customer requirements migrating data to Oracle's order management module using visual basic code interface, reducing excess wire inventory by 35%$3.1 M and processing time by 70%. 2) Developed and integrated a plan-for-every-part database for circuits using maximum and minimum quantity, spaces in a circuit storage, adding routings in oracle, and a trigger to a cutting order; reducing obsolescence (80%),$1.4M excess inventory (35%), and processing time between cycles (35%). 3) Reduced the Raw Material monthly buy for circuits by 22% by creating, integrating, and implementing a Cutting Schedule database interfacing with the Oracle MRP module. Implemented the database in 7 manufacturing plant locations in Mexico and Honduras.$5.4 M over 3 years 4) Reduced barcode label customization costs 75%$250K over 2 years by creating and integrating an AIAG finished goods label customer identification database (1D, 2D and PDF barcode collection), successfully migrating data from Oracle. 5) Designed, installed, and integrated a data national database program (Chrysler test base) successfully migrating data from SQL and reducing development costs by 50%$75K. 6) Created and integrated a Data national digital manufacturing counter based on Tak-Time vs. production (16 seconds cycle) for four production lines successfully migrating data from SQL data server, reducing 80%$45K labor cost. 7) Improved Manufacturing Requirements Planning (MRP) explosion based on requirements and Bills of Materials (BOM) by implementing a database successfully migrating data from Oracle, reducing 60% processing time. 8) Developed, installed, and integrated a shortage database report based on customer requirements vs. on hand inventory successfully migrating data from Oracle, reducing 70% processing time. 9) Implemented Oracle 8 and upgrades (10.3 and 11i) in 17 Manufacturing Plant locations

Decision-makers

Other people at Pkc Group

Browse the Pkc Group team →

Build a list of verified contacts at Pkc Group

Free for 7 days · 50 credits · no card · only pay for verified records.

Start free

Reach more buyers like Angel

250M+ professionals with verified email and phone. You only pay for records that actually verify.

7-day trial · no credit card · cancel anytime

Angel Chavez Email & Phone Number @ Pkc Group | Kipplo Discover