Anzar A.
Qa Qc Inspector at Bureau Veritas Group
Based in Abu Dhabi Emirate, United Arab Emirates
7-day free trial · no credit card
Seniority
Staff
Department
Operations
Location
Abu Dhabi Emirate
Industry
Environmental Services
Company size
55K
Contact information
Reveal Anzar's email and phone
Direct contact data is gated. Sign up and reveal. You only pay for verified records.
a•••••••@group.bureauveritas.com
Phone
5 credits+971 ••• •••• ••••
You only pay for valid records. Bounced emails and disconnected numbers cost nothing.
Background
About Anzar A.
SKILLS ADNOC Job performer ADNOC Performing Authority Dolphin Energy Performing Authority. Piping Installation Testing & Commissioning of Pipes. HVAC Equipment Installation. Testing commissioning of HVACequipment. Able to understand the E&I drawings Maintenance works. Bill of Material (BOM) Cost estimation Negotiation with supplier Well Knowledge in MEP works. Auto-Cad drafting Documentation Problem-Solving Estimation Project Management Tools Strong Communication Attend daily Tool box talk meeting High-value project management TRAINING - TFOET OPITO Approved-(95614)- Basic H2S Training form ETSDC, Abu Dhabi- ADNOC WMS Approved- Certified in AUTOCAD MEP PROJECTS COMPLETED 1. Installation of Deluge Valve system at SARB North & South - Client- ADNOC Offshore - Position-Job Performer Scope of work - Preparation of P & ID & Isometric Drawing of pipes- Estimation of pipe & Fittings- Procurement of UNS C71500 (Cu Ni 70/30) pipe and fittings ASTM B402 UNS C71500, as per ASME B16.48- Procurement of ASTM A106 Gr.B pipe- Procurement of GRE Pipe ASTM D2996, Type-1, Class-F- Fabrication and painting of piping spools as per the Isometric drawing followed by ADNOC Offshore specification- Preparation of Hydrotest procedure as per the ADNOC Offshore specification- Installation of under ground GRE pipe 5" tapping connection with 12" pipe. Installation of 24" Flow meter in Air seperation Plant Client- ADNOC Gas Processing Position-Job Performer + Performing Authority Location- Mirfa SCOPE Modification of 24" Pipe and install new Flowmeter. Modification of 14" Pipe and install NRV. Rerouting of 1" pipe line. Preparation of method statement to modify the pipe. Perform Hot work activity with proper safetyprecautions. Performing Radiography Test, Ultrasonic test and DPT. Project handover documents. As-built document/drawing. Replacement of the Chilled water valves - Client- ADNOC Offshore - Location- UPPER ZAKUM, ACPT - Position-Job Performer Scope of work - Replacement of 5" Chiller valve 4 numbers- Replacement of 4" AHU valve and Pump valve - 5 numbers- Procurement of Honeywell make valve- Preparation of method statement for the replacement of the valves- Scaffolding arrangement support from client side- Removal of cladding and insulation from the valves- Hot bolting one day prior to replace the valve- Removal of existing and installation of new valves- Installation new insulation and cladding- Punch point clearance- Project handover documents- As-built document/drawing LANGUAGE - English - Hindi
Decision-makers
Other people at Bureau Veritas Group
- REManager
Rajivie Elakkuvan
Quality Manager - Climate Change Services · Other
- RCStaff
Remy Cathala
Responsable d'operations Rejets Atmosphériques Et Rejets Aqueux · Other
- LCStaff
Laura Calvo
Técnico Comercial · Sales & Business Development
- AMDirector
Azrulhafiq Mohd Azizi
Head of Ndt · Operations
- SMStaff
Surajit Mondal
Executive Assistant · General Business & Management
Build a list of verified contacts at Bureau Veritas Group
Free for 7 days · 50 credits · no card · only pay for verified records.
Reach more buyers like Anzar
250M+ professionals with verified email and phone. You only pay for records that actually verify.
7-day trial · no credit card · cancel anytime