Verified recordEnvironmental Services

Anzar A.

Qa Qc Inspector at Bureau Veritas Group

Based in Abu Dhabi Emirate, United Arab Emirates

View on LinkedIn

7-day free trial · no credit card

Seniority

Staff

Department

Operations

Location

Abu Dhabi Emirate

Industry

Environmental Services

Company size

55K

Contact information

Reveal Anzar's email and phone

Direct contact data is gated. Sign up and reveal. You only pay for verified records.

Email

1 credit

a•••••••@group.bureauveritas.com

Phone

5 credits

+971 ••• •••• ••••

You only pay for valid records. Bounced emails and disconnected numbers cost nothing.

Background

About Anzar A.

SKILLS ADNOC Job performer ADNOC Performing Authority Dolphin Energy Performing Authority. Piping Installation Testing & Commissioning of Pipes. HVAC Equipment Installation. Testing commissioning of HVACequipment. Able to understand the E&I drawings Maintenance works. Bill of Material (BOM) Cost estimation Negotiation with supplier Well Knowledge in MEP works. Auto-Cad drafting Documentation Problem-Solving Estimation Project Management Tools Strong Communication Attend daily Tool box talk meeting High-value project management TRAINING - TFOET OPITO Approved-(95614)- Basic H2S Training form ETSDC, Abu Dhabi- ADNOC WMS Approved- Certified in AUTOCAD MEP PROJECTS COMPLETED 1. Installation of Deluge Valve system at SARB North & South - Client- ADNOC Offshore - Position-Job Performer Scope of work - Preparation of P & ID & Isometric Drawing of pipes- Estimation of pipe & Fittings- Procurement of UNS C71500 (Cu Ni 70/30) pipe and fittings ASTM B402 UNS C71500, as per ASME B16.48- Procurement of ASTM A106 Gr.B pipe- Procurement of GRE Pipe ASTM D2996, Type-1, Class-F- Fabrication and painting of piping spools as per the Isometric drawing followed by ADNOC Offshore specification- Preparation of Hydrotest procedure as per the ADNOC Offshore specification- Installation of under ground GRE pipe 5" tapping connection with 12" pipe. Installation of 24" Flow meter in Air seperation Plant Client- ADNOC Gas Processing Position-Job Performer + Performing Authority Location- Mirfa SCOPE Modification of 24" Pipe and install new Flowmeter. Modification of 14" Pipe and install NRV. Rerouting of 1" pipe line. Preparation of method statement to modify the pipe. Perform Hot work activity with proper safetyprecautions. Performing Radiography Test, Ultrasonic test and DPT. Project handover documents. As-built document/drawing. Replacement of the Chilled water valves - Client- ADNOC Offshore - Location- UPPER ZAKUM, ACPT - Position-Job Performer Scope of work - Replacement of 5" Chiller valve 4 numbers- Replacement of 4" AHU valve and Pump valve - 5 numbers- Procurement of Honeywell make valve- Preparation of method statement for the replacement of the valves- Scaffolding arrangement support from client side- Removal of cladding and insulation from the valves- Hot bolting one day prior to replace the valve- Removal of existing and installation of new valves- Installation new insulation and cladding- Punch point clearance- Project handover documents- As-built document/drawing LANGUAGE - English - Hindi

Decision-makers

Other people at Bureau Veritas Group

Browse the Bureau Veritas Group team →

Build a list of verified contacts at Bureau Veritas Group

Free for 7 days · 50 credits · no card · only pay for verified records.

Start free

Reach more buyers like Anzar

250M+ professionals with verified email and phone. You only pay for records that actually verify.

7-day trial · no credit card · cancel anytime

Anzar A. Email & Phone Number @ Bureau Veritas Group | Kipplo Discover