Chris Ding
Process Control Leader at New Gold Inc
Based in Kamloops, Canada
7-day free trial · no credit card
Seniority
Manager
Department
Manufacturing & Production
Location
Kamloops
Industry
Mining
Company size
1.1K
Contact information
Reveal Chris's email and phone
Direct contact data is gated. Sign up and reveal. You only pay for verified records.
c•••••••@newgold.com
Phone
5 credits+1 ••• •••• ••••
You only pay for valid records. Bounced emails and disconnected numbers cost nothing.
Background
About Chris Ding
Highlights: • Certified Instrumentation Applied Science Technologist (BC Canada) • Certified Instrumentation and Automation Control Engineer (China) • Strong skills in DCS programming, and system administrating (DeltaV, RS3) • Excel in PLC programming and troubleshooting (Modicon PLC, Allenbradly PLC, GE PLC) • Extensive experience in optimizing process control system; debugging and troubleshooting Alarm & Emergency Shut down Control System • Professionally performed project preparation and supervision for technical upgrade of control system • Solid knowledge in field instrument installation, troubleshooting and calibration Accomplishment: 1. Configured DCS & commissioned for • Flotation Blowers control system including control design (2014) • Mine dewatering control system including control design (2013) • Mill control system commission & Startup(2012) • Underground conveyor control system commission & Startup(2011) • Sag mill direct feed control system (2011) • Copper column and Moly column sparge control system(2011) • New Tailings control system (2010) • New lime distribution control system(2010) • Pollyanna waste water discharge control system(2009) • Reclaim water discharge system (2009) • Ball Mills Expert control system(2008) • Bulk and Copper Thickener control system(2008) • Flotation cells air control system(2007) • Molex Unit and Hydro treating Unit process control system • Compressor control system (1997) • Alarm & Emergency Shut down Control System for entire plant (1997) 2. Implement DeltaV MPC control for flotation cells control system (2010) 3. Coded PLC programs for • Bulk Regrind Pump control system (2008) • Rotary Valve Control system 4. Led and supervised Engineering for • DCS system installation, commission, start-up (1997) • Rotary Valve Control system installation, commission, start-up • Emergency Shut down Control System installation, commission, and start-up (1997)
Decision-makers
Other people at New Gold Inc
- JPStaff
Jorge Pacheco
Warehouse Technician · Operations
- DSStaff
Devan Swaine
First Nations Coordinator · General Business & Management
- DLManager
Dan Light
Underground Mine Supervisor · Operations
- JSStaff
Josh Scott
Preventative Maintenance Technician · Operations
- WMManager
William McCleary
Safety Superintendent · Operations
Build a list of verified contacts at New Gold Inc
Free for 7 days · 50 credits · no card · only pay for verified records.
Reach more buyers like Chris
250M+ professionals with verified email and phone. You only pay for records that actually verify.
7-day trial · no credit card · cancel anytime