Felippe Sevenini

Project Leader Peregrino Field Brz - Artificial Lift System Esp - Slb at Slb

Based in Minas Gerais, Brazil

View on LinkedIn

7-day free trial · no credit card

Seniority

Other

Department

Other

Location

Minas Gerais

Industry

Technology, Information and Internet

Company size

82K

Contact information

Reveal Felippe's email and phone

Direct contact data is gated. Sign up and reveal. You only pay for verified records.

Email

1 credit

f•••••••@slb.com

Phone

5 credits

+55 ••• •••• ••••

You only pay for valid records. Bounced emails and disconnected numbers cost nothing.

Background

About Felippe Sevenini

Project Leader - Equinor Peregrino Field (Present)- Project Leader for Equinor Peregrino Phase I and II Project Offshore Brazil- Dry tree ESP systems completion at platforms WHP-A, WHP-B and WHP-C- Manage the project inventory, planning and execution in Peregrino Project- ESP strings installed in POD 7-5/8" or Production Packer Completions- Fixed offshore platform, dry-tree ESP completions in Equinor Peregrino Field Brazil- Project execution for high tier offshore & subsea applications.Project Services Specialist - 3R Petroleum Papa Terra Project (2022 - 2024)- Project Services Specialist for 3R Petroleum Papa Terra (PPT) Project- ESP POD installations- Subsea ESPs, wet tree ESP completions producing to 3R-3 FPSO- Dry tree ESP systems producing to 3R-2 TLWP and pumped to 3R-2 via subsea flowline- Involved during the project initiation, planning and execution- Inventory control.Field Supervisor (2013 - 2023)- Subsea ESP well, wet tree completions in Bauna Field, Karoon- Petrobras Papa Terra Subsea and TLWP Dry Wells Project- Equinor Peregrino dry wells ESP completions- Shell MOBO Caisson BC-10 Project - Petrobras MOBO Caisson Jubarte Project- Petrobras MOBO Caisson Golfinho Project- Petrobras ESP Skid Installation - Parque das Baleias Project- Petrobras Sidon/ Piracaba Project - Subsea ESP Completion, Wet Tree- Perenco Vermelho, Pargo and Carapeba Field ESP installation in dry wells completions- Monitoring, commissioning 15 wells with EMS Controller @ Jubarte Phase II controller- ESP well testing DST operations in heavy oil reservoirs working for OGX offshore Brazil- ESP well testing DST working for Petrobras offshore deepwater Brazil in Abare and Tingua Field. Heavy oil reservoirs.ALS Field Specialist (2009 - 2013)- Workover operation in dry wells for Devon in Polvo Field offshore Brazil- Inloan to northeast base in Catu-BA during development stage of my career- Petrobras Barra do Furado Water Treatment Plant uses a 2x HPS Pump to inject water in aquifer- Manage the project initiation, planning and execution- Commissioning of 2x HPS in Amine Plant in Carmopolis-SE Field- Petrobras HPS Project in P-35 FPSO offshore Brazil, water Injection. HPS system with HP motor, involved during maintenance to change thrust changer and final commissioning.

Decision-makers

Other people at Slb

Browse the Slb team →

Build a list of verified contacts at Slb

Free for 7 days · 50 credits · no card · only pay for verified records.

Start free

Reach more buyers like Felippe

250M+ professionals with verified email and phone. You only pay for records that actually verify.

7-day trial · no credit card · cancel anytime

Felippe Sevenini Email & Phone Number @ Slb | Kipplo Discover