Gilca Ciprian
Field Engineering Manager at Saipem
Based in Pattaya, Thailand
7-day free trial · no credit card
Seniority
Manager
Department
Engineering
Location
Pattaya
Industry
Engineering Services
Company size
27K
Contact information
Reveal Gilca's email and phone
Direct contact data is gated. Sign up and reveal. You only pay for verified records.
g•••••••@saipem.com
Phone
5 credits+66 ••• •••• ••••
You only pay for valid records. Bounced emails and disconnected numbers cost nothing.
Background
About Gilca Ciprian
Engineering activities performed in Romania and Italy offices have assumed the following-Calculation of Power Cable cross section and sizing of Power Transf. using SmartPlant Electrical Program-Developing and updating of Electrical Load List required for sizing of transformers, switchgears and UPS's-Design of the substations layout-Design and calculation for lighting system-Layouts for new equipments-Earthing layouts and mounting details-Lighting layout and mounting details-Cable routing layout-Single Line Diagram-Protection and metering diagram for MV & LV Switchgears-Load Summary-Bill of Quantities/Materials-Data Sheet, Specification for UPS, LV/MV Switchgear, Power Transformer, Power Cable. On site for the following Projects: KCC -Saudi Arabia(1 year and half), Qafco 5 & 6 - Qatar( 2 years), Enna - Sicily/Italy(3 months). Rabigh2 -Saudi Arabia( 2 years), Jazan Pkg2 -Saudi Arabia ( in present ), I had performed-Vendors assistance for LV/MV Switchgear and UPS Panels during installation and testing-Issue of FDN’s( Field Design Notice), Site Instruction for solving the engineering problems occurs during the construction activity-Monitoring of electrical materials during construction work-Issue of Purchase Requisition and Technical Bid Evaluation for additional materials-Update of master documents as per site modifications-Follow and solving the Electrical Punch Items-Cost Estimation for additional electrical works -Coordination with electrical supervisors for achieving substation energization, motors solo run and breakers functional test-Survey, engineering and implementation of additional lights required for improving the illumination level after lux illumination test-Check and approval of electrical AS BUILT drawings-Preparing of Commissioning Packages for all Electrical Equipments-Site supervision for installation of Heat Tracing System, Earthing System, Lighting System and Cathodic Protection System
Decision-makers
Other people at Saipem
- SGManager
Silvia Gentilucci
Technology Manager Acid Gas Treatment and Sulphur Recovery · Other
- SCStaff
Suresh Chandran
Project Expeditor · Operations
- IMStaff
Irene Meroni
Electrical Material Procurement · Other
- MMStaff
Mahmood Muffariz
Process Engineer · Engineering
- LDDirector
Livio Decise
Project Director · General Business & Management
Build a list of verified contacts at Saipem
Free for 7 days · 50 credits · no card · only pay for verified records.
Reach more buyers like Gilca
250M+ professionals with verified email and phone. You only pay for records that actually verify.
7-day trial · no credit card · cancel anytime