Harris Setyo
Electrical Instrument Engineer at Pertamina Hulu Energi Oses
Based in West Java, Indonesia
7-day free trial · no credit card
Seniority
Staff
Department
Engineering
Location
West Java
Industry
Oil and Gas
Company size
365
Contact information
Reveal Harris's email and phone
Direct contact data is gated. Sign up and reveal. You only pay for verified records.
h•••••••@••••••.com
Phone
5 credits+62 ••• •••• ••••
You only pay for valid records. Bounced emails and disconnected numbers cost nothing.
Background
About Harris Setyo
Having more than 10 years experiences as Instrument Engineer in design engineering, construction, mechanical completion, pre-commissioning & commissioning project in Oil & Gas EPC for Upstream & downstream with various projects such as Pre-FEED & FEED green field offshore platform & onshore, LPG Facility, Detail Design Engineering, modification & verification instrument equipment in brown field project. With experience summaries as follows: 1. Work with team members to design project the most effective based on client, company, and oil & gas standart. Capable to prepared and operate software in generating design documents/drawing and Supervise project (phase up to commissioning) as follows-Instrument Scope of Works -Instrument Specification -Instrument Philosophy & Control Narrative -Generate cost estimation, for tender project -Review for Vendor Deliverable, Such as transmitter, etc -Technical Bid Evaluation (TBE)-Producing instrument index and I/O List -Preparing instrument datasheet -Producing Material Take Off (MTO) and Cable & Tubing Schedule -Sizing control valve, pressure safety valve, orifice bore, Thermowell and Tubing -Generating and reviewing loop diagram -Support FAT, SIAT, and SAT Procedure -Generate Cause & Effect Matriks -Prepare & Review Wellhead Control Panel Schematic -Calculate Consumption of power and gas for the needs of plant-Review instruments drawing, such as level sketch, interconnection block diagram, instrument layout, instrument hook-up, instrument cable, typical installation detail, and etc As Project Management Team : • Support team to detailed project plan that includes schedules, budgets, resource allocation, and risk management strategies. • identify potential risks and develop mitigation strategies to ensure smooth project execution • manage the project’s finances, ensuring all activities are executed within the approved budget. • allocate resources efficiently, including materials, equipment, and manpower, to avoid delays or overspending. • act as the central point of communication, coordinating efforts among various technical teams (mechanical, electrical, process, piping, and civil). • oversee on-site project activities to ensure compliance with technical specifications, schedules, HSE Regulation and budgets. • review progress reports and address issues promptly to keep the project on track.
Decision-makers
Other people at Pertamina Hulu Energi Oses
- WRManager
Wawan Rahmanto
Production Supervisor · Manufacturing & Production
- MSStaff
Maman Sudarman
Jr Ggr Area 1 · Operations
- RSManager
Regina Supriadi
Production Sr Planning and Evaluation Analyst · Operations
- MIManager
Mario Indra Wibawa
Assistant Manager Hsse Performance, Assurance & Ercm · Operations
- WRStaff
Wrahaspati Rulandoko
Geophysicist · Science
Build a list of verified contacts at Pertamina Hulu Energi Oses
Free for 7 days · 50 credits · no card · only pay for verified records.
Reach more buyers like Harris
250M+ professionals with verified email and phone. You only pay for records that actually verify.
7-day trial · no credit card · cancel anytime