Holger Weinert
Lead Associate - Construction Management at Delve Underground
Based in Vancouver, Canada
7-day free trial · no credit card
Seniority
Other
Department
Other
Location
Vancouver
Industry
Engineering Services
Company size
306
Contact information
Reveal Holger's email and phone
Direct contact data is gated. Sign up and reveal. You only pay for verified records.
h•••••••@delveunderground.com
Phone
5 credits+1 ••• •••• ••••
You only pay for valid records. Bounced emails and disconnected numbers cost nothing.
Background
About Holger Weinert
Played a key role on some of the largest construction projects worldwide such as the High-Speed Rail 1 in the UK, the 2012 Olympic Park Project, London’s Water Framework and Crossrail 1 Project, the Riyadh Metro Project, the Edmonton’s Valley Line Light Rail Transit Project, and currently on various Greater Metro Vancouver underground projects. Gained specific expertise in tunnelling (EPB and Slurry TBMs), segmental pre-cast concrete lining, sprayed and CIP tunnel lining, launch shafts and cut and cover portals (secant piles, diaphragm walls), cross-passages (steel tybbing and sprayed lining), large retaining structures, pumping stations and large diameter pipes and culverts. Developed a high degree of communication skills, open-mindedness to different cultures and project challenges, and a very systematically, determined and goal orientated approach. Areas of Expertise- RC Structures (20 yrs.+)- Tunnels (10 yrs.+)- Portals/ Shafts/ Stations (8 yrs.+)- Large Retaining Walls (Piles, Slurry Walls)(8 yrs.+)- Utilities (Large dia Pipes)(6 yrs.+)- Treatment Plants (3 yrs.+)- Elevated Guideways - Steel Frames
Decision-makers
Other people at Delve Underground
Build a list of verified contacts at Delve Underground
Free for 7 days · 50 credits · no card · only pay for verified records.
Reach more buyers like Holger
250M+ professionals with verified email and phone. You only pay for records that actually verify.
7-day trial · no credit card · cancel anytime