Verified recordOil and Gas

Irwin Masing

Health and Safety Officer at Rotary Mec Malaysia Sdn Bhd

Based in Kuching, Malaysia

View on LinkedIn

7-day free trial · no credit card

Seniority

Staff

Department

Public Administration & Safety

Location

Kuching

Industry

Oil and Gas

Company size

101

Contact information

Reveal Irwin's email and phone

Direct contact data is gated. Sign up and reveal. You only pay for verified records.

Email

1 credit

i•••••••@rotaryeng.com.sg

Phone

5 credits

+60 ••• •••• ••••

You only pay for valid records. Bounced emails and disconnected numbers cost nothing.

Background

About Irwin Masing

Pleased to make your acquaintance, I am Irwin ak Masing, currently a Safety and Health Officer with 6 years work experience. Being 6 years of service in Occupational Health, Safety and Environment, I am a self-driven HSE Competent person, successfully expediting HSE in all aspects for following Projects- EPCC of Bitumen Depot For BASB At Senari Synergy Oil, Gas and Chemical Industrial Complex, Kuching, Sarawak : Lead in (DOSH) Blasting And Painting Dosh Putrajaya (HQ) Approval : Lead In (DOSH) JKKP JKJ 103 Site Registration : SW/20/03/154054 Lead In MITI & SDMC Approval To Operate. Assists In (DOSH) Permit To Install (PTI)/ Permit To Operate (PTO) Petroleum Pipelines: JKKP PSD SP127/453/26-1241(2) Formulate and implements ICOP Confined Space 2010. Arrangement of radiography works as per ANSI N543-1974 and No.13 International Atomic Energy Agency EPCC of A Pressurized Firewater System For BASB At Senari Synergy Oil, Gas and Chemical Industrial Complex, Kuching, Sarawak : Lead in (DOSH) JKKP JKJ 103 Site Registration SW/21/03/171859 Assists in BOMBA Approval For Occupation Permit : JPBM-SK-BKK : 700/2/1-10/81 The Construction And Commissioning Of Bitumen Piperack/Pipebridge At Senari Synergy Oil, Gas and Chemical Port MTLD 5, Jalan Bako, Kuching, Sarawak : Formulated Crane Inspection Checklist and pre-Lift Inspection Checklist as per LOLER 1998, BS 7121 series, BS 7121-3:2017+A1:2019, BS EN Formulated Rigging Hardware Inspection Checklist as per ASME B30.26-2015. Developed Fire by Welding Prevention Checklist as per NFPA 51B-A2003 ROP. Coordinate Non-Routine Lifting over hydrocarbon pipelines as per Lifting Plan. The Engineering, procurement, Construction and Commissioning on The Watermain From Jalan Bako to Borneo Asphalt Sdn Bhd’s Bitumen Depot at Senari Synergy Industrial Complex (“Works”): Assists in DBKU Wayleave Approval for HDD Drilling DBKU IMTWY/W2019/02 Formulated and implement Traffic Control as per JKR ATJ 2C/85 (Pindaan 2017) EPCC Rectification and Modification of Mooring Dolphin 1 At Senari Synergy Oil, Gas and Chemical Port MTLD 5, Jalan Bako, Kuching, Sarawak : Close coordination of works with SSPSB Marine Control Center working with tanker vessels. I may be reached at 016 - 8870 769 or irwinmasing92@gmail.com and looking forward to hear from you soon. Have a great day ahead.

Decision-makers

Other people at Rotary Mec Malaysia Sdn Bhd

Browse the Rotary Mec Malaysia Sdn Bhd team →

Build a list of verified contacts at Rotary Mec Malaysia Sdn Bhd

Free for 7 days · 50 credits · no card · only pay for verified records.

Start free

Reach more buyers like Irwin

250M+ professionals with verified email and phone. You only pay for records that actually verify.

7-day trial · no credit card · cancel anytime

Irwin Masing Email & Phone Number @ Rotary Mec Malaysia Sdn Bhd | Kipplo Discover