Seniority
Manager
Department
Operations
Location
Umargam
Industry
Farming
Company size
13K
Contact information
Reveal Jitendra's email and phone
Direct contact data is gated. Sign up and reveal. You only pay for verified records.
j•••••••@upl-ltd.com
Phone
5 credits+91 ••• •••• ••••
You only pay for valid records. Bounced emails and disconnected numbers cost nothing.
Background
About Jitendra Manvar
total 20 year experience in agrochemicals industry like R&D, project commissioning, production.(1) R&D - technology transfer process developmentlab scale up to 1 Kg scale up.work parameter are MOC study, rate of reaction, material balance, mixing pattern, batch cycle time,RMC,quality, yield and capex preparation with project team.(2) Yield improvement and troubleshooting (3) scale up upto pilot plantScale up up to 100 kg batch size.parameter:mixing pattern, rate of reaction, batch cycle time, material balance, energy balance, reaction behaviour quality impurities profile, RMC, yield.Same as commercialized in plant.below product are commercialized and improvement in process during R&D.(1)Aciflorfen,(2)Lactogen,(3)Oxide,(4)Metasystox,(5)Ethofumisate,(6)Propragyl chloride(7)Imidacloropide,(8)Lambada cyhalothrine,(9)Beta cypermethrin,(10)Cypermethrin,(11)Permethrine (12)Bifenthrine(2) Project commissioning role and responsibilities.Operation Qualification Design qualificationMechanical qualification instrument qualification Process understanding, P & ID, material balance, energy balance, BCT, class room training, field training, Process punch point genaration, PSSR, water trials and safely chemical charging and finally established the hand over to plant manager Plant commission (1)DMAPAT(2)UPDT(3)WDG (Mancozeb)(4)Chlomazone(5)Glufocoinate(6)Pendimethalin(7)MEE(8)DVACL(9)Metribuzation International commissioning (1) WDG (Mancozeb)(3)As Production manager role and responsibilities :To monitoring & control of production planning on daily basis as well as weekly and monthly.Review of the production status w.r.t dispatch planTo minimize charge over time, perform decontamination of equipment as per procedure.Meet monthly & yearly production targets by managing the approved budget, build a robust safety culture and ensure a safe work place targeting zero accident and zero incident.Monthly MIS reviewEnsure effective preventing and brackdown maintanence to minimize equipment downtime and production loss.Effective management & optimum utilisation of resources e.g manpower, machines, energy, Raw material, utilitiesProduct cost optimisationDrive the safetyCapacity enhancement.(1) Bifenthrine(2) Cypermethrin(3) Permethrine
Decision-makers
Other people at Upl
Build a list of verified contacts at Upl
Free for 7 days · 50 credits · no card · only pay for verified records.
Reach more buyers like Jitendra
250M+ professionals with verified email and phone. You only pay for records that actually verify.
7-day trial · no credit card · cancel anytime