Kalyanakumar Kasinathan
Qc Engineer at Brunel Technical Services Manpower Corp
Based in Kuwait
7-day free trial · no credit card
Seniority
Staff
Department
Science
Location
Kuwait
Industry
Oil and Gas
Company size
64
Contact information
Reveal Kalyanakumar's email and phone
Direct contact data is gated. Sign up and reveal. You only pay for verified records.
k•••••••@brunel.net
Phone
5 credits+965 ••• •••• ••••
You only pay for valid records. Bounced emails and disconnected numbers cost nothing.
Background
About Kalyanakumar Kasinathan
Multi-discipline quality personnel with having more than 17 years of progressive working experience in onshore oil & gas and petrochemical construction industries. Knowledgeable in welding fabrication, erection, Coating(3LPE,3LPP & CWC External Coating & Internal Coating) painting and civil related work for Pipeline and Piping, Storage Tank, JOB RESPONIBILITIES@ CROSS COUNTRY PIPELINE Preliminary Route Survey Right of Way preparation Trenching Stringing Bending Welding & NDT Tie-In weld joint Field Joint Coating Lowering and back filling Cathodic Protection System Mechanical clearance for Testing Hydrostatic Testing Dewatering, Swabbing, Purging and Gas charging Installation of markers and Final clean up HDD crossings –Rail/ road / river / nallah crossings Commissioning Surveillance Large commercial internal pipeline Verification and approval of laying graphs, Inspection Reports Finalization of inspection and test plan for all stages including finalization of various work procedures (such as WPS, PQR, NDT, Hydro testing, Lowering, Backfilling etc,) Verification and certification of Laying, Testing reports and as built drawing JOB RESPONIBILITIES@(PIPE MILL) Inspection of L-SAW & H-SAW Pipes manufacturing. Quality Inspection of Pipe Laying. Coil MTC review as per API 5L 43rd edition & customer Specification. Coil UT as per ASTM A578 Level B for body & Level C for edges. WPS/PQR/WPQ – ASME SEC IX / API 5L APPENDIX – C Weld Procedure. SAW & Repair welds as per approved WPS. Continuous tack welds as per approved WPS. Witnessing of real time Radiography (FLUOROSCOPY) & Manual UT. Hydro test witness. Final Auto Ultrasonic Testing (FUT) and Manual UT witness of helical weld Seam as per API 5L. Radiographic interpretation of Pipes as per API 5L and customer specification. Mechanical testing, Chemical testing, Documentation. Visual & Dimensional Inspection, Review of NDT Reports and Final clearance.
Decision-makers
Other people at Brunel Technical Services Manpower Corp
Build a list of verified contacts at Brunel Technical Services Manpower Corp
Free for 7 days · 50 credits · no card · only pay for verified records.
Reach more buyers like Kalyanakumar
250M+ professionals with verified email and phone. You only pay for records that actually verify.
7-day trial · no credit card · cancel anytime