Karan Dev

Assistant Manager Electrical at Thyssenkrupp

Based in Jamnagar, India

View on LinkedIn

7-day free trial · no credit card

Seniority

Manager

Department

Engineering

Location

Jamnagar

Industry

Industrial Machinery Manufacturing

Company size

36K

Contact information

Reveal Karan's email and phone

Direct contact data is gated. Sign up and reveal. You only pay for verified records.

Email

1 credit

k•••••••@thyssenkrupp.com

Phone

5 credits

+91 ••• •••• ••••

You only pay for valid records. Bounced emails and disconnected numbers cost nothing.

Background

About Karan Dev

KARAN DEV Cell No:+91-8594958720 +91-8090962676 E-mail: karanthakur786@gmail.com Linkedin: CARRIER OBJECTIVE Seeking job opportunity as an Electrical engineer with progressive organization where I can utilize my technical knowledge and technical skills and contribute to the growth of the organization. Key Responsibility Areas Employment •• Refinery MOC, extension projects, shut down/Turn-around (T.A)/Fertilizer likes B.S-VI, PPU,ROG PSA, KHDS, BBU,DHDT, FGTU,CDU-VDU revamp, HGU revamp, offsite, Urea and Ammonia plant handled total electrical construction activities at site. • Installation, testing and commissioning of HV (33Kv, 11Kv, 6.6Kv) and LV (415V) switchgear panels likes PCC, MCC, EPMC and MLDB. • Installation, testing and commissioning of Oil filled and Dry type Transformers. • Installation and testing of earthing system like earth pit, earth strip and Lighting arrestor. • Installation and testing of HV (11Kv & 33Kv)/LV power & control cables. • Installation, testing and commissioning of Electrical heat tracing (E.H.T) system for process pipelines. • Installation, testing and commissioning of cathodic protection (C.P) system -sacrificial and impressed current anodes for underground pipelines, mounted bullet and vessel. • Installation of area lighting fixtures, welding receptacle, sockets, NLDB & ELDB lighting panels. • Installation PA (Public addressing) system and Fire alarm system, MCP, detectors, hooters indoor building and field area. • Installationof G.I and FRP cable trays substation cable cellar and plant area. • Issuances and planning of e-permit in SAP and co-ordination with operation and maintenance team. • Material inspection and Issuances through SAP module. • Preventative maintenance (PM)/Breakdown Equipment’s likes HV/LV motors, EOT’s crane & MOV’s as per maintenance schedule (SAP) with SMP. • Condition monitoring (C.M) & LLF for HV/LV motors, Transformers as per CM schedule. • Follow Permit system (Cold & Hot work) Indoor Substation and field side LOTO TO (Log out, tag out & try out) procedure. • System turn over (STO) for non-process system preparing all documents and planned joint walk throughwith PMC/Client & prepared punch points for systems. • Adapted safety standards and achieved incident and injury free workplace (IIF). • Daily tool box talk (TBT) and Pre job discussion (PJD) with team and contractor manpower before commencing job. TOTAL WORK EXPERIENCE: 15 YEARS Yours Sincerely Karan Dev Date-05.02.2023

Decision-makers

Other people at Thyssenkrupp

Browse the Thyssenkrupp team →

Build a list of verified contacts at Thyssenkrupp

Free for 7 days · 50 credits · no card · only pay for verified records.

Start free

Reach more buyers like Karan

250M+ professionals with verified email and phone. You only pay for records that actually verify.

7-day trial · no credit card · cancel anytime

Karan Dev Email & Phone Number @ Thyssenkrupp | Kipplo Discover