Karim Refaat

Mechanical Maintenance Engineer at Siemens Energy

Based in Alexandria, Egypt

View on LinkedIn

7-day free trial · no credit card

Seniority

Staff

Department

Engineering

Location

Alexandria

Industry

Renewable Energy Power Generation

Company size

53K

Contact information

Reveal Karim's email and phone

Direct contact data is gated. Sign up and reveal. You only pay for verified records.

Email

1 credit

k•••••••@siemens-energy.com

Phone

5 credits

+20 ••• •••• ••••

You only pay for valid records. Bounced emails and disconnected numbers cost nothing.

Background

About Karim Refaat

Mechanical TFA Engineer have 9 years of experience, work mainly on HRSG rehabilitation and gas turbine maintenance (CI,HGPI,AGP+DLN upgrade) for different GE frames (9E, 9Fa, lm beside the commissioning & construction and planning work on many power plants (beha, kureimat, assuit, West domiat, sharm Elsheik), also working on waste water treatment field on many plants brigat, elmoatakbal and Alexandria East waste water treatment plant. Senior Site Engineer Project: Oman LNG Main contractor : Oman LNG replacement for the modules and transition duct and expansion joint fabricate and install the pipes for blow off lines of GT control and arrange of preassembly for The parts to be installed Handling and control all spare parts Mechanical lead & Planning Engineer Project: assuit Power plant (1500 MW) Main contractor :GE schedule and execute for air intake replacement replacement for the modules and transition duct and expansion joint lead a crew of Engineers and technicians to be ahead of schedule with arrangements and preassembly for The parts to be installed control and manage the time frame to make the Time losses and waste time as minimum as it possible -Handling all spare parts Make daily progress Report & updating of schedule Mechanical field Engineer Project: kureimat power station Main contractor :GE DLN 2.6 +AGP for Gas turbine Frame 9a (250 MW) take and record clearances of IGV (backlash, x gap, inner bushing), rotor position alignment (sex point check), TP clearances (set back clearance),Turbine rotor clearances Make daily progress Report & updating of schedule Site Construction Engineer Project: Sharm el-Sheikh power plant Main contractor : GE -Work on turbine LM GE modification for lube oil cooling system, Generator cooling system. Erection of six fin fan coolers for cooling lube oil system for both generator and turbine Installation of (piping, supports)of oil filing system for gas compressors Carry out of hydro test and blowing activities for fin fan cooler piping, Flushing and normalization for both Generator lube oil cycle, Turbine lube oil cycle ) Installation of false start drain system (pump, piping) Carry out of safety toolbox talking to mechanical construction team. Attending of all progress, updating and coordination Meeting Review the material according to packing list Site Mechanical Engineer Project :west domiat power plant Main contractor :GE Erection of insulation cladding for bypass stack. Installation of submersed pumps for drain system.

Decision-makers

Other people at Siemens Energy

Browse the Siemens Energy team →

Build a list of verified contacts at Siemens Energy

Free for 7 days · 50 credits · no card · only pay for verified records.

Start free

Reach more buyers like Karim

250M+ professionals with verified email and phone. You only pay for records that actually verify.

7-day trial · no credit card · cancel anytime

Karim Refaat Email & Phone Number @ Siemens Energy | Kipplo Discover