Kenneth Odenweller
Senior Process Engineer at Nov
Based in Freeport, United States
7-day free trial · no credit card
Seniority
Staff
Department
Engineering
Location
Freeport
Industry
Oil and Gas
Company size
37K
Contact information
Reveal Kenneth's email and phone
Direct contact data is gated. Sign up and reveal. You only pay for verified records.
k•••••••@nov.com
Phone
5 credits+1 ••• •••• ••••
You only pay for valid records. Bounced emails and disconnected numbers cost nothing.
Background
About Kenneth Odenweller
Detail-oriented engineer with over 7 years of manufacturing supervision and 25+ years of experience in Chemical Engineer Field (10+ years working with Ethylene & Propylene Oxide). SR Chemical Process Production Excel at performing as the principal technical advisor to operations, management, and process improvement teams. Adept at process engineering with conception, design, implementation, start-up and optimization. Developed and maintained a consistent track record of achieving organizational and individual goals, and always strive to maintain a positive relationship with my team and co-workers and to do my best work under tight deadlines and pressure. QUALIFICATIONS:* Continuous Process Improvement * LEAN Six Sigma Leader (Kaizen & 5-S)* PSM (PHA Leader)* Risk Cause Analysis * Expertise in troubleshooting * P & ID review & updates * OSIsoft PI Administrator * Software: Microsoft Office, SAP, & MiniTab ACCOMPLISHMENTS: • Self-Taught OSIsoft PI software and applications: developed trends for Operations and management. Implemented an automated OEE delay reporting process for 5 major reactors through using OSIsoft PI Datalink. • Mentored Co-Op Engineers and Leadership Development Program Engineers (Interns) assigning projects, providing them with guidance from concept through Start-up. • Lead engineer installing 2 rundown vessels reducing cycle time on the Alkoxylation reactors by 2-4 hours per batch saving 60 hours/month. • Automated the Alkoxylation products on the DCS. Optimized the top 80% products, reducing cycle time by 20%(while plant was at 100% capacity) • Modified Trialkyls unit’s overhead system increasing efficiency by 30% • Analyzed the TMI (Trimethylindium) process, reducing the cycle time by 30% • Replaced packing on a Stripping Column, increase production rate by
Decision-makers
Other people at Nov
- CMStaff
Craig Miller
Mechanical Service Engineer · Engineering
- SCStaff
Sang Chul Lee
Mechanical Technician · Engineering
- PTStaff
Probain Tchivongo
Field Operator Service Tecnician & Maintenance Soild Recovery (Tdu) Tecnician · Other
- MHManager
Marcus Hangen
Project Manager · Operations
- KBOther
Kamal Balakrishnun
Project Support Manager · Other
Build a list of verified contacts at Nov
Free for 7 days · 50 credits · no card · only pay for verified records.
Reach more buyers like Kenneth
250M+ professionals with verified email and phone. You only pay for records that actually verify.
7-day trial · no credit card · cancel anytime