Leandro Dias
Technical Leader at Siemens
Based in São Paulo, Brazil
7-day free trial · no credit card
Seniority
Manager
Department
Information Technology
Location
São Paulo
Industry
Automation Machinery Manufacturing
Company size
256K
Contact information
Reveal Leandro's email and phone
Direct contact data is gated. Sign up and reveal. You only pay for verified records.
l•••••••@••••••.com
Phone
5 credits+55 ••• •••• ••••
You only pay for valid records. Bounced emails and disconnected numbers cost nothing.
Background
About Leandro Dias
I am an Engineer with a career developed in the area of substation automation (DPCS) and solid experience in technical management of DPCS projects, working in companies such as Siemens, GE – General Electric do Brasil, Efacec do Brasil and Prosys Engenharia. Extensive experience with execution, development and implementation of control and supervision systems projects for transmission and power generation substations. Skilled in ensuring the best technical solution at the lowest cost, always attending the customer's specifications. Extensive knowledge of standards from various utilities, contributing to integrations and customer access in existing substations. Excellent technical basis on presenting solutions to customers and suggestions for improvements. I have expertise in analysis/preparation/implementation of executive projects of substation automation, critical following-up of factory acceptance tests of protection, control and supervision systems, attending the implementation of the system in the site, from commissioning to energizing phases. Interface with the execution team to continuously improve the process, and always attending the grid procedures. Interface with the execution team to continuously improve the process, and always attending the grid procedures. Main projects and results- Auction 4/6 from 2017 (Neoenergia-2019/2021) – 500/138kV: Interfaces with some transmission utilities (jun/2021)- SS Porto Sergipe / Jardim II (Celse - 2018/2020)- 500kV: Largest thermoelectric power plant in South America, with an installed capacity of 1.5GW. GE was responsible for implementing the switching substation DPCS- Auction 15/2017 (Arcoverde/Sterlite – 2018/2019) 230kV: Important project due to the extremely short delivery deadline- Fast Power – Argentina (MSU/Transba, Pampa and YPF - 2016/2017)- 132kv / 500kv: It made it possible to learn about the generation and transmission process in Argentina- SS Tucuruí (Eletronorte - 2013/2015)- 500/230/69/13,8kV: High level of complexity as it involves a high important transmission line in Pará state- IE-Madeira - HVDC (Furnas and CTEEP - 2011/2016): Multicultural project with an interface with England- CPTM (2009/2011) – Electrical Substation modernization – lines 7 and 12: Metro SP (2011)- Line 2 Extension.
Decision-makers
Other people at Siemens
Build a list of verified contacts at Siemens
Free for 7 days · 50 credits · no card · only pay for verified records.
Reach more buyers like Leandro
250M+ professionals with verified email and phone. You only pay for records that actually verify.
7-day trial · no credit card · cancel anytime