Louise Andersson
Asset Development Manager at Borealis
Based in Gothenburg, Sweden
7-day free trial · no credit card
Seniority
Manager
Department
Manufacturing & Production
Location
Gothenburg
Industry
Chemical Manufacturing
Company size
4.3K
Contact information
Reveal Louise's email and phone
Direct contact data is gated. Sign up and reveal. You only pay for verified records.
l•••••••@borealisgroup.com
Phone
5 credits+46 ••• •••• ••••
You only pay for valid records. Bounced emails and disconnected numbers cost nothing.
Background
About Louise Andersson
CRYO AB 2012 - 2014 Design and Construction of a LNG Terminal EPC - Deputy Project Manager & Contract Manager Responsible for contracts and claim management CRYO AB 2008- 2011 Detail Design and Construction of a LNG Terminal EPC - Discipline Leader Process First Mid Scale LNG terminal In Sweden. The goal with project is to construct a LNG receiving Terminal in Nynäshamn. The project included mass- and heat balances, P & IDs, layout, utilities, Hazops, area classification, a new DCS system, inquiries for equipment, purchase, comission and start up ect. Borealis AB 2008 Stenungsund Basic Design Revamp – Discipline Leader Process Basic Design for a Revamp of two existing process areas at Borealis Cracker, Stenungsund. The project also included a redesign of existing flare system.The project included new P & IDs, planning of Tie In, layout, utilities, Hazops, area classification, a new DCS system, inquiries ect. 2007 Stenungsund Basic Design Compressor for methane - Discipline Leader Process Volvo technology Transfer 2008 2007 Göteborg Prestudy and basic Design for Volvo Technology Transfer for upgrading of biogas to LNG – Discipline Leader for process design and mechanical design. The project included evaluation of technical methods for upgrading systems as well as sizing of equipment. Lantmannan AB Agroetanol 2006 - 2008. New production line for Bioethanol. Equipments, Investigations, Project Administration Project administration - Technical Coordinator Detail Design. The project was an EPMC contract and was multi-discipline. The aim for the project was to build the largest bioethanol plant northern Europe. Nynäs Refinery AB 2006-2007. Nynäshamn Disciplin Leader Process Preliminary study for a new cooling water system and fire protection system including cost estimate. Heat exchangers - Trouble shooting through
Decision-makers
Other people at Borealis
- NDStaff
Niels Driessens
Chemisch Operator · Manufacturing & Production
- JVOther
Joonas Vainionpää
Senior Engineer, Inspection · Other
- LSStaff
Lisa Simone
Customer Service · Customer/Client Service
- AQOther
Abdullah Qureshi
Digital Product Owner - Borstar Digital Twin · Other
- DSStaff
Dietmar Salaberger
Senior Engineer · Engineering
Build a list of verified contacts at Borealis
Free for 7 days · 50 credits · no card · only pay for verified records.
Reach more buyers like Louise
250M+ professionals with verified email and phone. You only pay for records that actually verify.
7-day trial · no credit card · cancel anytime