Lynn Robison
Document Control Manager at Parsons Corporation
Based in San Antonio, United States
7-day free trial · no credit card
Seniority
Manager
Department
Supply Chain & Logistics
Location
San Antonio
Industry
Civil Engineering
Company size
10001+
Contact information
Reveal Lynn's email and phone
Direct contact data is gated. Sign up and reveal. You only pay for verified records.
l•••••••@parsons.com
Phone
5 credits+1 ••• •••• ••••
You only pay for valid records. Bounced emails and disconnected numbers cost nothing.
Background
About Lynn Robison
EXPERIENCE SUMMARY Document Control Manager/Field Office Coordinator for the following projects with Parsons:* Tyndall AFB Hurricane Michael Rework/Design, San Antonio TX,$56 million • SPR LE2, Strategic Petroleum Reserve Life Extension 2, Houston TX,$1 billion • SH-183, SH-183 Managed Lanes, Kiewit,$875 million, Dallas, TX • HRT-JV, Houston Rapid Transit Joint Venture, METRO, Houston, TX,$1.2 billion • 070B-FSA, Flowserve Settlement Agreement, SNWA, Las Vegas, NV $2.5 million • 340-A, Coyote Springs ROFC, Moapa, NV,$15 million • 370-E, Mechanics Maintenance Workshop Addition, SNWA, Las Vegas, NV,$9 million • 072-AR, Pumping Expansion and No. 3 Pumping Station, SNWA, Las Vegas, NV,$32 million • 080-F, Chemical Additions to AMSWTF, SNWA, Las Vegas, NV,$39 million • 310-C, IPS-1 Pump and Motor Replacement, SNWA, Las Vegas, NV,$21 million • 07211-A, IPS-2 Pump and Motor Purchase, SNWA, Las Vegas, NV,$16 million • 07212-A, IPS-2 Cone Valve System Purchase, SNWA, Las Vegas, NV,$3 million • 07213-A, IPS-2 Discharge Pipe Purchase, SNWA, Las Vegas, • 070-B, Raw Water Pumping Station, SNWA, Las Vegas, NV,$110 million • 070-C, River Mountains Aqueduct, SNWA, Las Vegas, NV,$15 million • 110-C, Substation Mass Excavation, SNWA, Las Vegas, NV • 100-D, SNWS Power Systems Upgrades, Equipment Procurement, SNWA, Las Vegas, NV,$5 million • 100-E, Power Systems Upgrade, Equipment Installation, SNWA, Las Vegas, NV,$10 million • 100-GR, Material Procurement, SNWA, Las Vegas, NV,$3 million • 110-A, River Mountains Lateral, Foothills Pumping Station to Burkholder Reservoir, SNWA, Las Vegas, NV,$8 million • 110-D, Foothills 2210 Pumping Station, SNWA, Las Vegas, NV,$16 million • 110-J, Communication System for SNWS Phase II Improvements, SNWA, Las Vegas, NV,$2 million • 110-X, Black Mountain Rate of Flow Control Station, SNWA, Las Vegas, NV,$2 million • 810-E, Las Vegas Wash Bostic Weir, SNWA, Las Vegas, NV,$5 million • 910-AR, Las Vegas Wash Erosion Control Structure No. 1, SNWA, Las Vegas, NV,$2 million
Decision-makers
Other people at Parsons Corporation
- SLDirector
Stuart Landau
Sr Technical Director · Information Technology
- SMOther
Stephen M. Butler
Federal Engineering Manager · Other
- CMOther
Christopher McGinty
Information Security Specialist · Other
- SAStaff
Samir al Kharraz
Digital Operations Engineer · Information Technology
- RMStaff
Renato M. Tolosa
Asst Resident Engineer · Engineering
Build a list of verified contacts at Parsons Corporation
Free for 7 days · 50 credits · no card · only pay for verified records.
Reach more buyers like Lynn
250M+ professionals with verified email and phone. You only pay for records that actually verify.
7-day trial · no credit card · cancel anytime