Verified recordOil and Gas

Manoj Mishra

Instrumentation Control Design Engineer at Cb&i

Based in West Delhi, India

View on LinkedIn

7-day free trial · no credit card

Seniority

Staff

Department

Engineering

Location

West Delhi

Industry

Oil and Gas

Company size

12K

Contact information

Reveal Manoj's email and phone

Direct contact data is gated. Sign up and reveal. You only pay for verified records.

Email

1 credit

m•••••••@cbi.com

Phone

5 credits

+91 ••• •••• ••••

You only pay for valid records. Bounced emails and disconnected numbers cost nothing.

Background

About Manoj Mishra

Instrumentation & Control Design Engineer, GurgaonProject: Afipka LLC Hydrocracker complex located in the Krasnodar Territory of Russia.Responsible for activities: • Cable tray layout, MTO, cable list.• F&G layout, F&G List.• Assigned Hook-up and Prepared Bulk MTOSXL Ethane Mariner East Project (Ethane & Propane facilities) located at Marcus hook, PA, USAResponsible for activities:• Installation Details, Process Hook-Ups, Pneumatic Hook-ups,• Cable Block Diagrams,• Instrument Location Layouts, F&G Location Layouts, Project- Port Bonython Fuels Import Facility – FEED Project Located in the Eyre Peninsula in South Australia.Responsible for activities:• Prepared Bulk MTO.• JB Grouping.• Cable Length calculation Project: Staatsolie Crude Upgrade & Expansion – EPC Project Located in Suriname, South America.Responsible for activities:• Responsible for 3D Modelling in PDS for Trench and Junction Boxes.• Prepared Design Deliverables (Hook ups, JB Wiring / termination Drawing, Instrument Location and Cable Routing Layout).• Prepared Bulk MTO. • Prepared Cable Schedule.Project: DONG Crude Stabilization Unit – EPC Project located in DENMARK.Responsible for activities: • Responsible for 3D Modelling for Fire and Gas detectors in PDMS. • Prepared Hook-ups. Proposal Engineering for Buru Port Construction Facility, Buru Energy Limited, Burrup (Western Australia).Responsible for activities: • Prepared Control Room Layout and Conceptual System Bock Diagram using AutoCAD.Project: NKNK Grassroots Olefins Complex- FEED project ‘NizhneKamskNefteKhim’ located in Nizhnekamsk, the republic of Tartarstan, Russia. Responsible for activities: • Responsible for 3D Modeling of cable trays (using PDMS)• Involved in Preparation of Design Deliverables (Hook ups of Process, Flow, Mounting and Electrical details).• Involved in Preparation of Equipment List, cable list, Junction box list, cable list.

Decision-makers

Other people at Cb&i

Browse the Cb&i team →

Build a list of verified contacts at Cb&i

Free for 7 days · 50 credits · no card · only pay for verified records.

Start free

Reach more buyers like Manoj

250M+ professionals with verified email and phone. You only pay for records that actually verify.

7-day trial · no credit card · cancel anytime

Manoj Mishra Email & Phone Number @ Cb&i | Kipplo Discover