Marline Claessens

Truths System and Operations Manager at European Space Agency - Esa

Based in Noordwijk-Binnen, Netherlands

View on LinkedIn

7-day free trial · no credit card

Seniority

Manager

Department

Other

Location

Noordwijk-Binnen

Industry

Space Research and Technology

Company size

6.6K

Contact information

Reveal Marline's email and phone

Direct contact data is gated. Sign up and reveal. You only pay for verified records.

Email

1 credit

m•••••••@esa.int

Phone

5 credits

+31 ••• •••• ••••

You only pay for valid records. Bounced emails and disconnected numbers cost nothing.

Background

About Marline Claessens

Participated 5th Student Parabolic Flight Campaign (ESA) with Experiment on mass determination, Bordeaux, France -Winner of the Marina Van Damme Price in 2009 https://marinavandammenetwerk.nl Worked as a system engineer on the following ESA projects:* EBDM, project prime Verhaert Space: Tasks-Est. of system requirements + fault tolerant philosophy/redundancy concept. April 2006-June 2006 https://certificate.insead.edu/c8c907e0-a3de-4146-8f4b-2717a5c3d3a3?key=fa6ecfb1257d496d73806e87d294ba8f7b61ffa417fc7d634831ccafd27fc5ed * XEUS Capture Tool: This tool is designed to perform a capture operation between ERA and a free flying vehicle. Task: Design of the camera unit: LED, CCD, Target recognition algorithm selection. Sep 2006-Nov 2006 * Don Quijote phase A study ( prime QinetiQ): This study involves an interplanetary mission towards an asteroid. The design of the impacting satellite was defined by Verhaert. April 2006-June 2007.* PROBA3 phase A study ( prime Thales/Astrium): This study involves a formation flying and sun corona mission in a HEO. Sept 2006- June 2007.* LandObs phase A study ( prime Verhaert Space): This study involved the design of a PROBA type of satellite for a 300 m resolution EO mission. The spacecraft will fly an innovative payload based on a reflective design. Sep 2006-July 2007 * IBDM DMD (prime SENER): Definition of a spaceflight mission to provide the in-orbit validation of the IBDM. Task: system design of two spacecraft Chaser and Target + design of S/C for docking on the Russion Progress. September 2007-February 2008 * PROBA3 Bridging Phase B ( prime SSC): On-going study based on the phase A. Design of Coronagraph SC for a PSLV launch. Specialties: Key expertise: mission analysis, requirements definition, system engineering, spacecraft mechanical design, accommodation studies, power budget, link budget, antenna selection, radiation analysis, propulsion system sizing, risk analysis, English report writing.

Decision-makers

Other people at European Space Agency - Esa

Browse the European Space Agency - Esa team →

Build a list of verified contacts at European Space Agency - Esa

Free for 7 days · 50 credits · no card · only pay for verified records.

Start free

Reach more buyers like Marline

250M+ professionals with verified email and phone. You only pay for records that actually verify.

7-day trial · no credit card · cancel anytime

Marline Claessens Email & Phone Number @ European Space Agency - Esa | Kipplo Discover