Meka Devi Vara Prasad
Associate Manager at Gmr Hyderabad International Airport Ltd
Based in West Godavari, India
7-day free trial · no credit card
Seniority
Manager
Department
Operations
Location
West Godavari
Industry
Airlines and Aviation
Company size
1.2K
Contact information
Reveal Meka's email and phone
Direct contact data is gated. Sign up and reveal. You only pay for verified records.
m•••••••@••••••.com
Phone
5 credits+91 ••• •••• ••••
You only pay for valid records. Bounced emails and disconnected numbers cost nothing.
Background
About Meka Devi Vara Prasad
Associate Manager with 8.3 years of experience in Solar power plant installation and commissioning and O&M operations, preparing generation forecast and analysis reports. Inverter and Tracker maintenance and Microsoft Excel. Assistant Manager Greenko Groups, Hyderabad. July 2018 – Present Responsible person for planning and oversighting (operations, Resources, Material) and procurement coordination for TS cluster. Monitoring all O&M activity of 35 MW solar power plant. Handling material management activities in SAP MM, PM tool like PR, PO, MIGO transactions. Maintaining daily generation report, losses report, Fault rectification report and next day action plan report. Managing and coordinating all activities at site (PTW, TBT, checking permits, updating GOMS) with site engineers, GET’s, technicians. Breakdown identification in Inverters, IDT’s, PSS, Tracker, String and Module. Responsible for store activities as well – Warehouse Management, Material Issue and receiving, orders, billing, COCS and MIS report. Maintenance Engineer Vantech Chemical Limited, Hyderabad Sep 2017 – July 2018 Assistant Engineer Mantena Infra Private limited, Hyderabad. Jun 2016 – Aug 2017 ACHIEVEMENTS & INOVATIONS LIMIT SWITCH - Whenever there is a failure of Limit Switches or PLC’s, the tracker drives are moving over tilt which results in tracker gear shaft & gear drives and also there is a chances of PV module damages. So by this implementation, we can control the above damages. The Emergency Push Button will be placed beneath of the PV Modules and fixed both direction east & west side (- 45° & 45°). SHADOW EFFECT :Some tables are Bumpy due to land surface so the table next to the table will take the shadow effected so we reduce the shadow effect The table next to the table will take the shadow effected that table decreasing the gap through by performing modules side by side and removing the gap between the modules to modules. INSTALLATION OF ID FAN IN INVERTER ROOM: To increase inverter performance and reduce inverter room temperature. To avoid dust accumulation, we have installed air filters with wire mesh to reduce dust entry. SUN GROW INVERTER AIR EXHAUST DUCT MODIFICATION: Reducing the IGBT Cabinet Temperature and Generation loss due to Temperature. MODULE RE-GROUPING: Damaged modules in total plant are interspersed and are placed on low inverter capacity. This increases generation, string healthiness and helps in finding amps gain.
Decision-makers
Other people at Gmr Hyderabad International Airport Ltd
- LPStaff
Lavanya Pamena
Customer Service Executive - Terminal Operations · Other
- VAStaff
Vinay Ammapuram
Associate · Operations
- NVManager
N. Viswanatha Reddy
Agm-electrical · Engineering
- MMManager
Murali Mohan Reddy
Associate Manager Airport Systems · Other
- DHManager
Dean Hookens
Associate Manager Guest Relations · Customer/Client Service
Build a list of verified contacts at Gmr Hyderabad International Airport Ltd
Free for 7 days · 50 credits · no card · only pay for verified records.
Reach more buyers like Meka
250M+ professionals with verified email and phone. You only pay for records that actually verify.
7-day trial · no credit card · cancel anytime