Verified recordOil and Gas

Muhammad Rizwan

Rover Operator Utilities at Qatarenergy Lng

Based in Muzaffargarh District, Pakistan

View on LinkedIn

7-day free trial · no credit card

Seniority

Staff

Department

Other

Location

Muzaffargarh District

Industry

Oil and Gas

Company size

8.3K

Contact information

Reveal Muhammad's email and phone

Direct contact data is gated. Sign up and reveal. You only pay for verified records.

Email

1 credit

m•••••••@qatarenergylng.qa

Phone

5 credits

+92 ••• •••• ••••

You only pay for valid records. Bounced emails and disconnected numbers cost nothing.

Background

About Muhammad Rizwan

Industrial Field / Plant Operator - experienced in Utilities / Effluent (ETP)/ Waster Water Treatment plants (WTP); Experience at Pakistan's largest Refinery (PARCO) and largest Fertilizer (FFC) Industry: Operation, Monitoring & Troubleshooting of Rotating Equipment Operations Coordination Chemical Handling Pre-Commissioning/Commissioning Turnaround HSE & Electrical Safety : with Three water tube, Dual fuel firing Boilers each having capacity of 65 ton/hr by Macchi, Italy: System (Ion Exchange and De-aeration) 85 m3/hr ionic Italba ion exchange trains: For Plant and Instrument Air system, with two automatic self-regeneration Dryer Trains: Which is Induced Draft Cross flow type, consisting of 04 cells, 03 centrifugal pumps two are condensing Steam Turbine driven : Fuel oil system and fuel Gas system: Wet and Dry Gas : which consists of H2SO4 & NAOH unloading, Storage and Distribution to different users plants: ETP / Waste Water Treatment Plant (Based on API, DAF, Aeration Basins, Clarifiers, Sand Filters, Oily and Bio sludge treatment systems,Slop oil recovery and Sanitary waste water treatment plant which consists of Rotating Biological Contactors): PARCO(Pak-Arab Oil refinery limited) at Utilities section, Crude Oil processing facility of BPSD. Fauji Fertilizers Company Ltd.(FFC) at Steam Generation Units (Boilers/Auxiliary Boilers), Urea Production capacity: 2 million tons per annum: Successfully completed safe execution of new de-aerator installation and commissioning activity with enhanced capacity of 342m3/h. Successful replacement of super heater bundles of two boilers, commissioning, leak testing and startup of boilers: AutoCad M.S Office Professional Suite Expert (Word, Excel, Power Point, Access): Adaptability Communication Creativity Leadership Collaboration

Decision-makers

Other people at Qatarenergy Lng

Browse the Qatarenergy Lng team →

Build a list of verified contacts at Qatarenergy Lng

Free for 7 days · 50 credits · no card · only pay for verified records.

Start free

Reach more buyers like Muhammad

250M+ professionals with verified email and phone. You only pay for records that actually verify.

7-day trial · no credit card · cancel anytime

Muhammad Rizwan Email & Phone Number @ Qatarenergy Lng | Kipplo Discover