Verified recordConstruction

Paul Thibeault

Jet Boat Operater at Peace River Hydro Partners

Based in Canada

View on LinkedIn

7-day free trial · no credit card

Seniority

Staff

Department

Operations

Location

Canada

Industry

Construction

Company size

291

Contact information

Reveal Paul's email and phone

Direct contact data is gated. Sign up and reveal. You only pay for verified records.

Email

1 credit

p•••••••@prhp.ca

Phone

5 credits

+1 ••• •••• ••••

You only pay for valid records. Bounced emails and disconnected numbers cost nothing.

Background

About Paul Thibeault

WORK EXPERIENCE March / 2012 to March / 2015 Nexen, Horn River Basin, Dilly Creek Senior Operator Operated and maintained 3 Glycol dehys. 6 Compressors, 5 Generators, natural gas and diesel, water injection wells and pumps. Then Completed Constuction and Commissioning of new plant. 3 3616 catapillars with 6 throw ariel compressors, 2 Glycol Dehy’s, 2 gas gen sets, VRU and gas coolers. 24” pipelines. June / 2011 to March / 2012 EOG Resources, Horn River Basin Contract Operator Operated and maintained Glycol dehy. 3 Field compressors. Multiple well pads. Optimized plunger lift Systems. Maintained power generation. Jan / 2011 to June / 2011 Glencoe Resources Contract Battery Plant Operator Operated and maintained Refridge system. C02 Vapour injection Compressors. Liquid C02 Pumps. Glycol Dehy, multiple CBM & oil wells with pump jacks. Plunger lift systems. April / 2004 to November / 2010 Talisman Energy, Chungo Operations Field / Plant Operator, Level 1. Operated and maintained Mole Sieve Dehy’s and field Compressors, 42 well sites. High pressure sour facility, 12 % H2s. Also Commissioning new Compressors, pipelines,well sites and Mole sieve replacements. June / to March / 2004 Pace Consulting Aberdeen, Scotland Under Balanced Drilling Consultant Responsible for building and commissioning new equipment in Great Yarmouth, England for offshore drilling projects. Supervised operations and trained on first U.B.D well offshore Denhelder, Holland. Completed offshore completions and Fracturing projects in Mussel Bay, South Africa, Malabo, Equatorial Guinea, Luanda, Angola. Started U.B.D coil tubing drilling project in Orenburg, Russia. Jan / 1988 to June / Northland Energy Services, Red Deer, AB Well testing and Under Balanced Drilling Supervisor Senior supervisor responsible for crews and equipment to drill and test wells.

Decision-makers

Other people at Peace River Hydro Partners

Browse the Peace River Hydro Partners team →

Build a list of verified contacts at Peace River Hydro Partners

Free for 7 days · 50 credits · no card · only pay for verified records.

Start free

Reach more buyers like Paul

250M+ professionals with verified email and phone. You only pay for records that actually verify.

7-day trial · no credit card · cancel anytime

Paul Thibeault Email & Phone Number @ Peace River Hydro Partners | Kipplo Discover