Rajkumar Ray
Mechanical Assistant Engineer in (4×50) MW Kopili hydropower station at Pes Engineers Pvt. Ltd
Based in West Bengal, India
7-day free trial · no credit card
Seniority
Other
Department
Other
Location
West Bengal
Industry
Renewable Energy Equipment Manufacturing
Company size
466
Contact information
Reveal Rajkumar's email and phone
Direct contact data is gated. Sign up and reveal. You only pay for verified records.
r•••••••@peseng.net
Phone
5 credits+91 ••• •••• ••••
You only pay for valid records. Bounced emails and disconnected numbers cost nothing.
Background
About Rajkumar Ray
The installation of a Francis turbine is one of the most commonly used types of hydroturbine for medium to high-head hydroelectric plants. Let me walk you through the general process of installing a Francis turbine. General Steps for Installing a Francis Turbine: Site Preparation and Foundation: The first step is to prepare the site where the turbine will be installed which usually involves creating a strong concrete foundation to support the weight of the turbine and its components. This includes ensuring proper alignment with the water intake and penstock and positioning the turbine in a way that ensures maximum efficiency. Transport and Assembly: Once the foundation is ready the individual components of the Francis turbine (rotor stator runner shaft etc.) are transported to the site. These components are typically large and heavy requiring cranes or other machinery to move them into position. The runner (the rotating part of the turbine) and the shaft are installed first along with the bearings that support the shaft. Aligning the Turbine and Generator: The turbine shaft is connected to the generator shaft and proper alignment is critical to ensure that both components work efficiently. The generator which is connected to the turbine via the shaft is then installed and its components are aligned carefully. Installation of the MIV (Main Inlet Valve): The Main Inlet Valve (MIV) is installed in the penstock to control the flow of water into the turbine. This valve is typically positioned upstream of the turbine and is crucial for regulating water flow particularly for maintenance purposes. Installation of Auxiliary Systems: The electrical control systems governor systems (which regulate the turbine speed and output) and lubrication systems for bearings are installed and connected. Hydraulic systems that control the guide vanes and other turbine components are also installed. Testing and Commissioning: Once the turbine is installed a series of tests are conducted to ensure everything is functioning properly. This includes checking alignment flow rates and safety systems. The turbine and generator are then tested under different load conditions to verify their performance before full-scale operation begins. Final Adjustments: After initial testing minor adjustments may be made to the turbine's guide vanes or other components to optimize efficiency and performance. Safety: Safety is a priority during installation. Workers should follow standard procedures and all equipment should be properly secured and tested.
Decision-makers
Other people at Pes Engineers Pvt. Ltd
- SNOther
Satyam Narayan
Senior Project Manager - Hydro Mechanical · Other
- SKStaff
Sujit Kumar
Mechanical Engineer · Engineering
- JMStaff
Jyotish Mech
Sr Engineer · Engineering
- DVManager
Divya Venkata Sai Bellamkonda
Senior Electrical Engineer · Engineering
- AHOther
Arukala Hanumanth
SAP Mm End User Procurment · Other
Build a list of verified contacts at Pes Engineers Pvt. Ltd
Free for 7 days · 50 credits · no card · only pay for verified records.
Reach more buyers like Rajkumar
250M+ professionals with verified email and phone. You only pay for records that actually verify.
7-day trial · no credit card · cancel anytime