Verified recordUtilities

Sergio Fiandaca

Responsabile Team Programmazione at Terna Spa

Based in Misterbianco, Italy

View on LinkedIn

7-day free trial · no credit card

Seniority

Manager

Department

Information Technology

Location

Misterbianco

Industry

Utilities

Company size

4.8K

Contact information

Reveal Sergio's email and phone

Direct contact data is gated. Sign up and reveal. You only pay for verified records.

Email

1 credit

s•••••••@terna.it

Phone

5 credits

+39 ••• •••• ••••

You only pay for valid records. Bounced emails and disconnected numbers cost nothing.

Background

About Sergio Fiandaca

Project engineer Approval Terna grid connection Wind farm “BUTERA” (ITALY) 18 MVA • Analysis and study of solar farm producybility by software (SOLAGIS – PVSYST) • Project Manager/Project engineer of n°3 PV Plant on roof in the public Building property of Ravenna Municipality (60 kWp) connections to 20kV • Project engineer Approval Terna grid connection Wind farm “ALZACUDA ” (MAZZARINO - ITALY) 14 MVA • Project engineer I-NEXT Capo d’Orlando (ME) site – 100 kWp PV plant on ROOF and 100kW /300kWh AC electrochemical storage • Project engineer MT 20kV cable GRID LINE and connection Building of ENEL DISTRIBUTION in Capo d’Orlando (ME) • Project Engineer MT 15kV cable GRID LINE and connection Building of ENEL DISTRIBUTION in San Giovanni in Persiceto (BO) • Project engineer Wind Turbine 60 kW bt 400V in Ascoli Satriano (FG) • Project engineer N°2 Wind Turbine 60 kW bt 400V in Marina di Ravenna (FG) • Project engineer taskforce Windfarm Ascoli Satriano 78 MW • Project engineer taskforce SOLAR FARM “PALEA ARSA” CASAMASSIMA BA 9,9 MWp • Project engineer taskforce Wind farm “Castellaneta” TA 56 MWp • CPI Licenze of ALFONSINE 132Kv Terna sub station • UTF Licenze of many PV and Wind Farms • Project engineer taskforce S.Alberto 2 PV plant located in Ravenna 27MWp • Project engineer taskforce S.Alberto PV plant located in Ravenna 34MWp • Project engineer taskforce ALFONSINE PV plant located in Ravenna 34MWp • Project engineer taskforce ALFONSINE 2 PV plant located in Ravenna 25MWp • Project engineer PV plant “RAFE” located in AUGUSTA 1 MWp • Project engineer PV plant “GAIA” located in AUGUSTA 1 MWp • Project engineer PV plant “ANITA” located in AUGUSTA 1 MWp

Decision-makers

Other people at Terna Spa

Browse the Terna Spa team →

Build a list of verified contacts at Terna Spa

Free for 7 days · 50 credits · no card · only pay for verified records.

Start free

Reach more buyers like Sergio

250M+ professionals with verified email and phone. You only pay for records that actually verify.

7-day trial · no credit card · cancel anytime

Sergio Fiandaca Email & Phone Number @ Terna Spa | Kipplo Discover