Thomas Perez
Environmental Inspector Technician at S&me
Based in Apex, United States
7-day free trial · no credit card
Seniority
Staff
Department
Engineering
Location
Apex
Industry
Civil Engineering
Company size
1.2K
Contact information
Reveal Thomas's email and phone
Direct contact data is gated. Sign up and reveal. You only pay for verified records.
t•••••••@smeinc.com
Phone
5 credits+1 ••• •••• ••••
You only pay for valid records. Bounced emails and disconnected numbers cost nothing.
Background
About Thomas Perez
PROJECT ROLE Chief Environmental Inspector COMPANY Raleigh & Charlotte, NC YEARS OF EXPERIENCE Joined S & ME May 10, 1984 DESC - Owens to Mt. Valley | 1/24 - Present Richland Co, SC Chief Env. Insp- 4 miles roadside 8” steel pipeline/2 miles MDPE. DENC - Hominy Creek Streambank Stabilization | 8/23 - 10/23 Buncombe Co, NC Chief Env. Insp- Two 300’ sections of streambank stabilization using redi-rock concrete blocks and various soil stabilization methods to repair extreme erosion due to flooding. DESC - Miscellaneous HDDs in S.C.| 10/22 - 7/23 DESC - Prestage Farms Gas Main Ext.| 3/22 - 9/22 Kershaw Co, SC Chief Env. Insp- roadside 6” pipeline. DESC - Hwy. 17 Byp. HP Gas Main Upgrade | 10/21 - 11/21 Horry Co, SC Contractor env. consultant - 4-mile roadside 8” pipeline. DENC - T-072 Natural Gas Pipeline Buncombe Co, NC | 12/20 - 10/21 & 1/23 - 6/23 Chief Env. Insp- 11.1-mile cross country 12” pipeline. DENC - T-030 Extension Natural Gas Pipeline Franklin & Wake Counties, NC | 1/20 - 12/20 Chief Env.Insp- 38-mile cross country 20” pipeline. Duke - Line 442 Natural Gas Pipeline Forsyth County, NC 8/18-2/19 Contractor env. consultant - 8-mile cross country 12” pipeline. PSNC- Cliffside Lateral Natural Gas Pipeline Cleveland & Rutherford Co, NC | 1/18-8/18 Chief Env. Insp- 6.75-mile cross country 16” pipeline. PSNC - Line T-001A Phase 2 Natural Gas Pipeline Cleveland, Rutherford, & Polk Co, NC | 2/17-8/19 Chief Env. Insp- 47.9-mile cross country 24” pipeline. PSNC - Line T-001A Phase 1 Natural Gas Pipeline Replacement Buncombe, Polk, & Henderson Co, NC | 1/16-11/16 Chief Env. Insp- 25.3-mile cross country 20” pipeline. PSNC - Line T-009B/Spencer Mtn. Natural Gas Pipeline Gaston Co, NC | 6/15-12/15 Sr. Env. Insp- 5 miles 12” cross country pipeline and 5 miles of 12” roadside pipeline. PSNC - Midland Connector Pipeline Cabarrus Co, NC | 2/15-6/15 Sr. Env. Insp- 10 miles of 8” roadside pipeline. PSNC - Line T-021B Pipeline Alamance & Orange Co, NC | 8/14-12/14 Sr. Env. Insp- 18 miles of 16” cross country pipeline. PSNC - Duke & North Durham Connector Durham & Orange Co. NC | 7/13-8/14 Sr. Env. Insp- 16 miles 12” transmission pipeline & 11 miles 12” roadside pipeline. PNG - Sutton Pipeline Richmond, Scotland, Robeson, Columbus, & Brunswick Co, NC | 5/12-12/12 Env. Insp- 128 miles of 20" natural gas pipeline. PNG - Wayne Pipeline Wake, Johnston, & Wayne Co, NC | 10/11-5/12 Env. Insp- 38 miles of 20” natural gas pipeline.
Decision-makers
Other people at S&me
Build a list of verified contacts at S&me
Free for 7 days · 50 credits · no card · only pay for verified records.
Reach more buyers like Thomas
250M+ professionals with verified email and phone. You only pay for records that actually verify.
7-day trial · no credit card · cancel anytime