Todd Langley
Senior Project Engineer at Enerflex Ltd
Based in Tulsa, United States
7-day free trial · no credit card
Seniority
Manager
Department
Engineering
Location
Tulsa
Industry
Oil and Gas
Company size
3.5K
Contact information
Reveal Todd's email and phone
Direct contact data is gated. Sign up and reveal. You only pay for verified records.
t•••••••@enerflex.com
Phone
5 credits+1 ••• •••• ••••
You only pay for valid records. Bounced emails and disconnected numbers cost nothing.
Background
About Todd Langley
Installed seven natural gas processing trains at three facilities totaling 220MM capacity o Front-End Engineering Design o Estimating Labor and Material Costs o Equipment Specifications, Purchasing, and Installation o Developed Process Flow, P & ID, and Plot Plan Drawings o Instrumental in many OSHA PHA Reviews for Facilities o Designed Concrete Foundations and Steel Structural Supports o Developed Written Project Scope and Gantt Chart o Evaluated Bids / Proposals and Awarded Contracts o Actively Managed Large Projects o Safely Started/Commissioned New Process Trains o Archive Important Facility Documents for OSHA PSM o Blast Studies using ALOHA and MARPLOT software Moved a 60MM gas processing train from an existing facility and reinstalled it at a greenfield site o 3D laser scan of donor site saved time and money during planning and reconstruction o Drone survey discovered site slope in excess of specification which was quickly corrected. Designed and built a condensate catching and stabilizing station o Met a very tight 90-day schedule o Overcame equipment problems imposed by short lead time Sized facility liquid and gas pipes per ASME B31.3 for all new construction projects o Developed a smart line list spreadsheet o Line list established a tag name for each pipe which was added to the P & ID drawings Stick built two compressor stations capable of 20MM each of low pressure gathering o Sized separators, tanks, compressors, instrumentation, fuel systems, flow meters, and pipes o For the second station, all the equipment, control valves, and pipes were installed on a single skid since they were all a matched set o The gas volume from that field declined and the skid was easily relocated and quickly placed in service which saved SPC time and money Managed a hot tap stopple project on a 12” steel pipeline o Installed a liquid slug catching vessel without stopping the flow in the pipeline o Used conflict resolution to avoid extra charges that the contractor was not due after the project started late and ran long Used drone photography at SPC’s facilities o Pictures taken from high elevations gave a general layout of SPC’s facilities o More detail and more up to date than satellite photos from Google Earth o Pictures taken from low elevations had enough detail that individual pipes could be followed o Photos were later referenced from the office which made site visits unnecessary Created an engineering library o Organized engineering documents, calculations, data books, owner’s manuals, fabrication drawings, ASME U1A forms, etc.
Decision-makers
Other people at Enerflex Ltd
- DPStaff
Daniel Palladino
Generalista De Rr Hh · Other
- MBStaff
Muhammad Babur
Mechanical Engineer · Engineering
- TKManager
Tanakorn Kaewprakat
Technical Lead · Information Technology
- GSStaff
Gina Stone
Project Manager · General Business & Management
- FLStaff
Fabricio Lins
Tecnico De Serviços De Óleo E Gás Sênior · Other
Build a list of verified contacts at Enerflex Ltd
Free for 7 days · 50 credits · no card · only pay for verified records.
Reach more buyers like Todd
250M+ professionals with verified email and phone. You only pay for records that actually verify.
7-day trial · no credit card · cancel anytime