Lakeside Efw logo
VerifiedRenewable Energy Power Generation· Founded 2008

Lakeside Efw

The Lakeside EFW facility at Colnbrook near Slough has been operational since 2010. Using advanced technology, this plant processes over tonnes of residual waste per year, generating 306GWh of power – enough to provide electricity to every household in Slough (86,267 homes). There is an education centre adjacent to Lakeside EfW, where schools and other groups can learn about sustainable waste management and energy from waste.

7-day free trial · no credit card

HeadquartersColnbrook, United KingdomEmployees29(11 to 50)Founded year2008Websitelakesideefw.co.ukLinkedIn profileLinkedIn

Verified contacts

20

available on Kipplo

LinkedIn employees

29

11 to 50 range

Open roles

no listings

Distinct roles

16

indexed titles

Tech stack

2

tools in use

Monthly traffic

4

organic / mo

Sign up free to see all 20 verified contacts at Lakeside Efw

Free for 7 days · 50 credits · no card · only pay for verified records.

Sign up free

Decision-makers and verified team members

20 contacts with verified email or phone · masked until revealed.

Sign up free →

Top roles at Lakeside Efw

16 distinct titles indexed · top 10 shown.

  • 3mechanical technician
  • 2electrical technician
  • 2operations technician
  • 1assistant operations manager
  • 1c & i eng supervisor
  • 1controls & instrumentation technician
  • 1electrical engineer
  • 1fuel reception operator
  • 1fuel reception supervisor
  • 1maintenance manager
  • +6more titles

Sign up to unlock all 20 contacts at Lakeside Efw

Free for 7 days · 50 credits · no card · only pay for verified records.

Sign up free

Sign up to reveal 20 verified contacts at Lakeside Efw

7-day trial · no credit card · cancel anytime · only pay for verified records.

Trusted by sales, marketing, and GTM engineering teams.

Lakeside Efw | Kipplo Discover