Seniority
Staff
Department
Other
Location
Burnaby
Industry
Utilities
Company size
6.8K
Contact information
Reveal Michael's email and phone
Direct contact data is gated. Sign up and reveal. You only pay for verified records.
m•••••••@bchydro.com
Phone
5 credits+1 ••• •••• ••••
You only pay for valid records. Bounced emails and disconnected numbers cost nothing.
Background
About Michael Hrad
Multiple years of experience in both thermal power and hydroelectric power generation. • Specialist Mechanical Engineer • Lead Commissioning Engineer for major projects. • Technical Lead for BC Hydro Construction Commissioning Leads Team. • Owner’s and Project Engineer/Lead Commissioning and Site Engineer for the Fort Nelson Upgrade Project. • Regional Project Manager responsible for delivering BC Hydro’s Thermal Generation Area (TGA) capital plan. • Lead Task Manager for 7 mechanical projects for Burrard Upgrade Project. • Engineering design. • Field experience as site engineer supervising work and personnel during facility shutdowns, equipment commissioning, and equipment/system troubleshooting. • Experience in major equipment (gas, steam and hydro turbines, generators, governors, coolers, boilers and condensers). • Experience in balance of plant systems (piping, compressed air, gas and liquid fuel, glycol, lube and jacking oil, high pressure steam, fire protection, cooling water / domestic water and sewage systems). • Experience in carbon steel & stainless steel fabrication. • HVAC / Fire protection design. • Application of codes and standards (external and BC Hydro internal). • 2D and 3D CAD and CAD applications
Decision-makers
Other people at Bc Hydro
Build a list of verified contacts at Bc Hydro
Free for 7 days · 50 credits · no card · only pay for verified records.
Reach more buyers like Michael
250M+ professionals with verified email and phone. You only pay for records that actually verify.
7-day trial · no credit card · cancel anytime